Quick answers
What is this project?
Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the Existing Road of Vaduj-Rikibadarwadi is a lapsed telecom project in Khabalwadi, Khatav, Satara, Maharashtra. It seeks 0.1 acres of forest land.
Who is building it?
The applicant is Arcsons Infratech Private Limited.
Has it been approved?
No. The application was lapsed on 11 Mar 2026, so it is no longer under consideration.
Where is it?
In Khabalwadi, Khatav, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹60 lakh and 260 m² of forest land.
When was it filed?
The application was filed on 23 Jan 2024.
Project details
| Official title | Proposal for Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the Existing Road of Vaduj-Rikibadarwadi in District Satara in the State of Maharashtra. |
|---|---|
| Status | Lapsed |
| Status since | 11 Mar 2026 |
| Application filed | 23 Jan 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Arcsons Infratech Private Limited |
| Forest land | 260 m² |
| Project cost | ₹60 lakh |
| Village / locality | Khabalwadi |
| Taluk / tehsil | Khatav |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15288 |
In context
29 applications in Satara since January 2022 are in the same category (Telecom): 2 approved, 2 filed or under review, and 25 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khabalwadi, Khatav, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Molasses and Cane Juice Based Distillery/ Grain based Distillery (RS/… — environmental approval granted, 1.3 km away
- Diversion of Forest Land for Laying Optical Fiber Cable With in Row of the… — in-principle approval, conditions pending, 1.7 km away
- Amendment in the existing EC 10000 TCD, new 60 MW Co-gen & 200 KLPD Molasses… — environmental approval granted, 5 km away
- Diversion of Forest Land at Proposed Location No.07 of Construction of 132KV… — lapsed, 6.9 km away
- Proposal of diversion of forest land at proposed Loc.No.07 of construction of… — in-principle approval, conditions pending, 6.9 km away
- 105 KLPD Grain based Distillery — environmental approval granted, 9.2 km away
- Environmental Clearance for Basalt Stone Quarry having area 2.00 Ha of Shri.… — environmental approval granted, 9.5 km away
- Environmental Clearance for the Stone Quarry of Shri. Amit Ravindra Ithape &… — environmental approval granted, 9.7 km away
More from Arcsons Infratech Private Limited in Satara
- Diversion of Forest Land for Laying Optical Fiber Cable With in Row of the… — in-principle approval, conditions pending
All 7 Arcsons Infratech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.