Quick answers
What is Proposed Expansion of Dharamtar Jetty facility (Phase III)?
Proposed Expansion of Dharamtar Jetty facility (Phase III) is a proposed port and coastal project in Wave, Pen, Raigarh, Maharashtra. The site covers 144.8 acres.
Who is building it?
The applicant is JSW Dharamtar Port Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 May 2026), as of 27 Nov 2026.
Where is it?
In Wave, Pen, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹2,500 crore and a site of 144.8 acres.
When was it filed?
The application was filed on 21 Feb 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Dharamtar Jetty facility (Phase III)
Project details
| Official title | Proposed Expansion of Dharamtar Jetty facility (Phase III) in village Dolvi of District Raigad, Maharashtra |
|---|---|
| Status | Cleared for impact study |
| Status since | 4 May 2026 |
| Application filed | 21 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Ports & coast |
| Applicant | JSW Dharamtar Port Private Limited |
| Land area | 144.8 acres (58.6 ha) |
| Project cost | ₹2,500 crore |
| Village / locality | Wave |
| Taluk / tehsil | Pen |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05513 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 11 Dec 2025 | Environmental approval granted | 144.8 acres | ₹2,500 crore |
| New project filed 24 Sept 2025 | Lapsed | 144.8 acres | ₹2,500 crore |
| Early planning filed 21 Feb 2024 (this page) | Cleared for impact study | 144.8 acres | ₹2,500 crore |
What the filings say
What is planned
JSW Dharamtar Port Private Limited (JSWDPPL) proposes the Phase III expansion of its existing jetty facility on the right bank of the Amba river and Dharamtar creek. The facility currently handles raw materials and products for the JSW Steel and JSW Cement plants at Dolvi. The expansion aims to increase cargo handling capacity from 33.95 million tonnes per annum (MTPA) to 54 MTPA (with some documents citing up to 57 MTPA). This increase is intended to support the expansion of the Dolvi steel plant to 15 MTPA.
The project involves utilizing the remaining 700 metres of approved berth length (Berths 10 to 13) in addition to the existing 1,050 metres (Berths 1 to 9). The applicant states that no additional construction is required beyond the expansion of cargo handling infrastructure. Key components of the expansion include:
- Dredging: Capital dredging of approximately 41,55,300 cubic metres. This includes 10,00,000 cubic metres of hard material to be used for filling low-lying areas behind the berths and 31,55,300 cubic metres of soft material to be dumped at designated offshore locations.
- Cargo Handling: Upgrading facilities to handle barges up to 6,000 deadweight tonnage (DWT) and Mini Bulk Carriers (MBC) of 8,000 DWT.
- Infrastructure: Installation of a new sub-station, a second pump house, and additional cargo handling equipment including a mobile harbour crane (1,200 tonnes per hour) and two jetty outgoing conveyors.
Cargo Handling Details
| Commodity | Existing (MTPA) | Total After Expansion (MTPA) |
|---|---|---|
| Iron Bearing Raw Material (IBRM) | 17.0 | 26.0 |
| Coal Bearing Raw Material (CBRM) | 8.00 | 10.0 |
| Fluxes | 3.00 | 7.00 |
| Finished Steel Products/Scrap | 2.50 | 3.00 |
| Cement & Clinker | 1.60 | 4.00 |
| LPG, Propane, Butane | - | 3.00 |
| Edible Oil & Liquid Cargo | - | 1.00 |
| Containers | 0.85 | 1.00 |
| Fertilizer, FRM, Gypsum | - | 1.00 |
| Grand Total | 33.95 | 57.0 |
Layout and design
The project is located in a Coastal Regulation Zone (CRZ) IVB area. The seabed at the site is highly undulated, consisting of soft silty clay sediments followed by hard strata at depths of 0 to 6 metres. Ship tranquility studies indicate that the meandering river and surrounding mangroves damp wave heights to less than 0.4 metres, providing adequate conditions for ships at berth. The layout includes covered storage yards (Yard A and Yard B), stacker-reclaimers, and a cross-country conveyor system to transport materials directly to the steel and cement plants.
Land and surroundings
The project occupies 58.6 hectares (144.8 acres) of existing jetty and backup area. The surrounding land use is approximately 49.6% vegetation and 30.7% agriculture. The applicant states that no forest land diversion or tree cutting is involved. Mangroves, including species like Avicennia marina and Sonneratia alba, are present along the creek banks near the northern side of the jetty. Baseline studies conducted between October and December 2023 found that ambient air quality and noise levels were generally within prescribed norms, though higher particulate matter was noted near industrial activity and heavy traffic on National Highway 66.
Water, power and access
Water requirement is expected to increase from 30 cubic metres per hour to 45 cubic metres per hour, sourced from the existing allocation from the Amba river at Nagothane. Domestic sewage will be treated in an existing 50-kilolitre-per-day sewage treatment plant, with treated water used for gardening. Power requirement for the expansion is 10,000 KVA, to be sourced from the Maharashtra State Electricity Distribution Co. Ltd. Access to the site is via the Alibaug-Pen Road and the Mumbai-Goa National Highway 66. A traffic study estimated that the expansion requires 576 equivalent car spaces (ECS) for parking, while 854 ECS are currently available.
Environmental safeguards
To mitigate dust, the applicant proposes covering bulk cargo with tarpaulin sheets, using closed conveyor galleries with dust suppression systems, and regular water sprinkling on stockpiles. Dredging will utilize cutter suction technology to minimize turbidity, and silt curtains will be deployed. An oil spill contingency plan has been prepared for a worst-case discharge of 16 tons of fuel, with response preparedness for up to 700 tons. The existing greenbelt of 10,619.1 square metres will be expanded by 1,383.4 square metres, bringing the total to 12,002.5 square metres.
What was said at the public hearing
A public hearing was held on 22 August 2025 at the JSW Jetty Truck Parking area. Key points raised included:
- Employment: Residents requested priority for local youth in direct and indirect jobs, including campus interviews at local colleges.
- Pollution: Concerns were raised regarding smog, smell, and the impact of slag being thrown on roads or in fields. Some participants alleged that pollution control systems are sometimes turned off at night.
- Fishing and Agriculture: Local representatives expressed concern that dredging might erode shores and hinder fishing, and that increased water lifting from the Amba river could affect local drinking water and agriculture.
- Mangroves: Objections were raised regarding the potential removal of mangroves and the need for strict implementation of CRZ 2019 rules.
- Support: Several local sarpanches and representatives supported the project, citing industrial development and social initiatives by the proponent.
Expansion of Dharamtar Jetty Facility (Phase III) site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
54 applications in Raigarh since January 2022 are in the same category (Ports & coast): 25 approved, 13 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 144.8 acres, this one is larger than 68% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wave, Pen, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — environmental approval granted, 0 m away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — lapsed, 0 m away
- Proposed construction of Conveyor Belt by JSW Steel Ltd. — more information requested, 100 m away
- Request for Change in User Agency Name from Adani Cementation Limited to Adani… — initial checks, 1.2 km away
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — more information requested, 1.2 km away
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — lapsed, 1.3 km away
- Greenfield Cement Grinding Unit with Cement Production Capacity of 4.5 Million… — environmental approval granted, 1.4 km away
- Greenfield Cement Grinding Unit with Cement Production Capacity of 4.5 Million… — environmental approval granted, 1.4 km away
All 3 JSW Dharamtar Port projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.