Cleared for impact studyIndustry · Nagpur, Maharashtra

Expansion of existing project for the manufacturing of Explosives and Defence products" by M/s Economic Explosives Limited

Expansion of existing project for the manufacturing of Explosives and Defence products" by M/s Economic Explosives Limited is a proposed industrial project in Shiwa, Nagpur (Rural), Nagpur, Maharashtra. The site covers 1,499.8 acres. Its stated project cost is ₹2,257.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Dec 2024).

See it on the live map All projects in Nagpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of existing project for the manufacturing of Explosives and Defence products" by M/s Economic Explosives Limited is a proposed industrial project in Shiwa, Nagpur (Rural), Nagpur, Maharashtra. The site covers 1,499.8 acres.

Who is building it?

The applicant is Solar Defence and Aerospace Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Dec 2024), as of 27 Nov 2026.

Where is it?

In Shiwa, Nagpur (Rural), Nagpur, Maharashtra.

How big is it?

It has a stated cost of ₹2,257.4 crore and a site of 1,499.8 acres.

When was it filed?

The application was filed on 16 Dec 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of existing project for the manufacturing of Explosives and Defence products"…

Project details

Official titleExpansion of existing project for the manufacturing of Explosives and Defence products" at Village - Sawanga, Post – Shiva, Tahsil - Nagpur, Dist.- Nagpur - 440 023, State Maharashtra by M/s Economic Explosives Limited
StatusCleared for impact study
Status since28 Dec 2024
Application filed16 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSolar Defence and Aerospace Limited
Land area1,499.8 acres (606.9 ha)
Project cost₹2,257.4 crore
Village / localityShiwa
Taluk / tehsilNagpur (Rural)
DistrictNagpur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-06666

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 5 Aug 2025Environmental approval granted1,499.8 acres₹2,257.4 crore
Early planning filed 16 Dec 2024 (this page)Cleared for impact study1,499.8 acres₹2,257.4 crore

In context

79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 1,499.8 acres, this one is larger than 91% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Shiwa, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Solar Defence and Aerospace Limited in Nagpur

3 Solar Defence and Aerospace projects in Nagpur
All 4 Solar Defence and Aerospace projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.