Quick answers
What is Industrial project by Solar Industries India Ltd.?
This lapsed industrial project by Solar Industries India Ltd. is in Khapri, Nagpur (Rural), Nagpur, Maharashtra. The site covers 18.7 acres.
Who is building it?
The applicant is Solar Defence and Aerospace Limited.
Has it been approved?
No. The application was lapsed on 16 May 2024, so it is no longer under consideration.
Where is it?
In Khapri, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹600 crore; a site of 18.7 acres and 10.6 acres (4.3 ha) of forest land.
When was it filed?
The application was filed on 13 Feb 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 May 2024 |
| Application filed | 13 Feb 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Industry |
| Applicant | Solar Defence and Aerospace Limited |
| Land area | 18.7 acres (7.6 ha) |
| Forest land | 10.6 acres (4.3 ha) |
| Project cost | ₹600 crore |
| Village / locality | Khapri |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15492 |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 18.7 acres, this one is smaller than 51% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khapri, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Solar Industries India Limited — forest land use approved, 0 m away
- Expansion of existing project for the manufacturing of Explosives and Defense… — returned to applicant, 500 m away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — environmental approval granted, 1.5 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — cleared for impact study, 1.5 km away
- Diversion of 0.038 Forest Land — lapsed, 1.6 km away
- Regularization of Manufacturing of Steel Casting Products through Continuous… — cleared for impact study, 2.8 km away
- Diversion of Landlocked & Isolated Piece of Forest Land (Zudpi Jungle) for… — initial checks, 3.1 km away
- Expansion of existing project for the manufacturing of Explosives and Defence… — environmental approval granted, 4.5 km away
More from Solar Defence and Aerospace Limited in Nagpur
- Expansion of existing project for the manufacturing of Explosives and Defence… — environmental approval granted
- Expansion of existing project for the manufacturing of Explosives and Defence… — cleared for impact study
3 Solar Defence and Aerospace projects in Nagpur
All 4 Solar Defence and Aerospace projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.