Quick answers
What is this project?
Regularization of Manufacturing of Steel Casting Products through Continuous Caster (Induction Furnace) at Khasra No. 151/1, 152/1, Village Bazargaon, Amravati Road, District Nagpur (Maharashtra) By: Ramson's Industries Limited is a proposed industrial project in Bajargaon, Nagpur (Rural), Nagpur, Maharashtra. The site covers 3.6 acres.
Who is building it?
The applicant is Ramsons Industries Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.
Where is it?
In Bajargaon, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹37.7 crore and a site of 3.6 acres.
When was it filed?
The application was filed on 23 Nov 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ramsons Industries Limited |
| Land area | 3.6 acres (1.4 ha) |
| Project cost | ₹37.7 crore |
| Village / locality | Bajargaon |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-00858 |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 3.6 acres, this one is smaller than 82% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bajargaon, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Landlocked & Isolated Piece of Forest Land (Zudpi Jungle) for… — initial checks, 450 m away
- Industrial project by Solar Industries India Limited — forest land use approved, 2.8 km away
- Industrial project by Solar Industries India Ltd. — lapsed, 2.8 km away
- Expansion of existing project for the manufacturing of Explosives and Defense… — returned to applicant, 3 km away
- Diversion of 0.038 Forest Land — lapsed, 3.3 km away
- Proposed Synthetic Organic Chemical Manufacturing Unit at Kh No. 13/3, PH No.… — cleared for impact study, 3.9 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — environmental approval granted, 4.3 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — cleared for impact study, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.