Quick answers
What is this project?
Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd is a proposed industrial project in Garamsur, Katol, Nagpur, Maharashtra. The site covers 113.7 acres.
Who is building it?
The applicant is Keltech Energies Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Sept 2024), as of 27 Nov 2026.
Where is it?
In Garamsur, Katol, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹136.4 crore and a site of 113.7 acres.
When was it filed?
The application was filed on 10 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd
Project details
| Official title | Proposed expansion of existing explosive products along with addition of new explosive products at Village Garamsur, Post Dudhala, Tehsil Katol, District Nagpur - 441103 Maharashtra by M/s. Keltech Energies Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 21 Sept 2024 |
| Application filed | 10 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Keltech Energies Limited |
| Land area | 113.7 acres (46 ha) |
| Project cost | ₹136.4 crore |
| Village / locality | Garamsur |
| Taluk / tehsil | Katol |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04196 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 31 Dec 2025 | Environmental approval granted | 113.7 acres | ₹136.4 crore |
| Early planning filed 10 Sept 2024 (this page) | Cleared for impact study | 113.7 acres | ₹136.4 crore |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 113.7 acres, this one is larger than 74% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Garamsur, Katol, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — environmental approval granted, 0 m away
- Industrial project by Solar Industries India Limited — forest land use approved, 1.5 km away
- Industrial project by Solar Industries India Ltd. — lapsed, 1.5 km away
- Expansion of existing project for the manufacturing of Explosives and Defense… — returned to applicant, 1.6 km away
- Diversion of 0.038 Forest Land — lapsed, 1.7 km away
- Regularization of Manufacturing of Steel Casting Products through Continuous… — cleared for impact study, 4.3 km away
- Diversion of Landlocked & Isolated Piece of Forest Land (Zudpi Jungle) for… — initial checks, 4.4 km away
- Expansion of existing project for the manufacturing of Explosives and Defence… — environmental approval granted, 5.3 km away
All 3 Keltech Energies projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.