Quick answers
What is this project?
Environmental Clearance for Proposed Establishment of Grain Based Distillery Plant to Manufacture RS/ENA/Pharma Grade Ethanol/Industrial Grade Ethanol/Fuel Grade Ethanol with production capacity of 1206 KLPD at 68% starch content is a proposed industrial project in Mandawa, Hingna, Nagpur, Maharashtra. The site covers 115.9 acres.
Who is building it?
The applicant is Shrem Bio Fuel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 1 Aug 2025), as of 27 Nov 2026.
Where is it?
In Mandawa, Hingna, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹12.5 crore and a site of 115.9 acres.
When was it filed?
The application was filed on 25 Jul 2025.
Project details
| Official title | Environmental Clearance for Proposed Establishment of Grain Based Distillery Plant to Manufacture RS/ENA/Pharma Grade Ethanol/Industrial Grade Ethanol/Fuel Grade Ethanol with production capacity of 1206 KLPD at 68% starch content along with 35 MW Co-generation Power Plant at Plot No. C -1 & C-2, Butibori Phase-2, MIDC Area, Village Mandawa, Taluka Hingna, District Nagpur, Maharashtra, India |
|---|---|
| Status | Cleared for impact study |
| Status since | 1 Aug 2025 |
| Application filed | 25 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shrem Bio Fuel Private Limited |
| Land area | 115.9 acres (46.9 ha) |
| Project cost | ₹12.5 crore |
| Village / locality | Mandawa |
| Taluk / tehsil | Hingna |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06874 |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 115.9 acres, this one is larger than 77% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandawa, Hingna, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mega Dairy at Plot No. D-5, Butibori MIDC Phase II, Nagpur-441122, by M/s.… — environmental approval granted, 1.1 km away
- Proposed Expansion of Existing Grinding, Screening and Sorting of Manganese… — under environmental review, 1.4 km away
- Regularization of Existing Rolling Mill of Capacity 28,000 TPA (25, 000 TPA… — cleared for impact study, 1.8 km away
- Proposed Production of Iron Castings and Iron Components at MIDC Butibori,… — withdrawn, 2.1 km away
- M/s. Indo U K Healthcare Private Ltd. Proposed a New Project of Common Bio… — environmental approval granted, 2.9 km away
- M/s. Indo U K Healthcare Private Ltd. Proposed a New Project of Common Bio… — cleared for impact study, 2.9 km away
- Proposed Wainganga Nalganga River Link Project (Link-0 and Link-1) — under environmental review, 3.2 km away
- "Expansion of Tyre Manufacturing Unit by M/s. CEAT LIMITED- MIDC BUTIBORI… — environmental approval granted, 3.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.