Quick answers
What is this project?
Regularization of Existing Rolling Mill of Capacity 28,000 TPA (25, 000 TPA Angles; 2000 TPA Channels; 1000 TPA Beams) with enhancement of capacity to 56,000 TPA (50000 TPA Angles; 4000 TPA Channels; 2000 TPA Beams) at Plot No. J-3, MIDC Butibori, Taluka. Hingna, District. Nagpur, Maharashtra by M/s. Vinar Ispat Limited is a proposed industrial project in Amgaon, Hingna, Nagpur, Maharashtra. The site covers 14.9 acres.
Who is building it?
The applicant is Vinar Ispat LTD.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Jul 2023), as of 27 Nov 2026.
Where is it?
In Amgaon, Hingna, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹19.7 crore and a site of 14.9 acres.
When was it filed?
The application was filed on 10 Jul 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Jul 2023 |
| Application filed | 10 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Vinar Ispat LTD |
| Land area | 14.9 acres (6 ha) |
| Project cost | ₹19.7 crore |
| Village / locality | Amgaon |
| Taluk / tehsil | Hingna |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01021 |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 14.9 acres, this one is smaller than 54% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amgaon, Hingna, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Grinding, Screening and Sorting of Manganese… — under environmental review, 550 m away
- Proposed Production of Iron Castings and Iron Components at MIDC Butibori,… — withdrawn, 650 m away
- Manufacturing of 2500 TPM Manganese Oxide Plot No. D-50 MIDC Butibori,… — environmental approval granted, 1.8 km away
- Manufacturing of 2500 TPM Manganese Oxide Plot No. D-50 MIDC Butibori,… — cleared for impact study, 1.8 km away
- Environmental Clearance for Proposed Establishment of Grain Based Distillery… — cleared for impact study, 1.8 km away
- Mega Dairy at Plot No. D-5, Butibori MIDC Phase II, Nagpur-441122, by M/s.… — environmental approval granted, 2.1 km away
- Regularization of Manufacturing of M.S. Billets, Rolled Mild Steel Product… — cleared for impact study, 2.6 km away
- Proposed Wainganga Nalganga River Link Project (Link-0 and Link-1) — under environmental review, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.