Quick answers
What is this project?
Proposed Expansion of Existing Grinding, Screening and Sorting of Manganese Ore & other Ferro Alloys with addition of Manufacturing 15,000 TPA of Ferro Titanium OR Ferro Silicon Magnesium OR Barium Inoculant by installing 3X1 T Induction Furnace (IF), OR 15000 TPA of Aluminium Wire Rod/AI Master Alloys using Wire Drawing Machine, and 10,000 TPA of Low Carbon Ferro Manganese OR Medium Carbon Ferro Manganese OR Ferro Molybdenum OR Ferro Vanadium by Thermite process is a proposed industrial project in Mandawa, Hingna, Nagpur, Maharashtra. The site covers 2.5 acres.
Who is building it?
The applicant is Vigour Metals and Alloys.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Mandawa, Hingna, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹12.2 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 4 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 5 Aug 2026 |
| Application filed | 4 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Vigour Metals and Alloys |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹12.2 crore |
| Village / locality | Mandawa |
| Taluk / tehsil | Hingna |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11346 |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 2.5 acres, this one is smaller than 85% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandawa, Hingna, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of Existing Rolling Mill of Capacity 28,000 TPA (25, 000 TPA… — cleared for impact study, 550 m away
- Proposed Production of Iron Castings and Iron Components at MIDC Butibori,… — withdrawn, 750 m away
- Environmental Clearance for Proposed Establishment of Grain Based Distillery… — cleared for impact study, 1.4 km away
- Mega Dairy at Plot No. D-5, Butibori MIDC Phase II, Nagpur-441122, by M/s.… — environmental approval granted, 1.5 km away
- Manufacturing of 2500 TPM Manganese Oxide Plot No. D-50 MIDC Butibori,… — environmental approval granted, 2.3 km away
- Manufacturing of 2500 TPM Manganese Oxide Plot No. D-50 MIDC Butibori,… — cleared for impact study, 2.3 km away
- Proposed Wainganga Nalganga River Link Project (Link-0 and Link-1) — under environmental review, 2.6 km away
- Regularization of Manufacturing of M.S. Billets, Rolled Mild Steel Product… — cleared for impact study, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.