Quick answers
What is this project?
Mega Dairy at Plot No. D-5, Butibori MIDC Phase II, Nagpur-441122, by M/s. Mother Dairy Fruit and Vegetable Private Limited is an approved industrial building project in Bhansoli, Hingna, Nagpur, Maharashtra. The site covers 25.8 acres.
Who is building it?
The applicant is Mother Dairy Fruit & Vegetable Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Nov 2025), as of 27 Nov 2026.
Where is it?
In Bhansoli, Hingna, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹537 crore and a site of 25.8 acres.
When was it filed?
The application was filed on 9 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Nov 2025 |
| Application filed | 9 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mother Dairy Fruit & Vegetable Private Limited |
| Use | Industrial |
| Land area | 25.8 acres (10.5 ha) |
| Built-up area | 47,357 m² (5,09,746 sq ft) |
| Project cost | ₹537 crore |
| Village / locality | Bhansoli |
| Taluk / tehsil | Hingna |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09265 |
In context
168 applications in Nagpur since January 2022 are in the same category (Buildings & townships): 128 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 25.8 acres, this one is larger than 68% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhansoli, Hingna, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Establishment of Grain Based Distillery… — cleared for impact study, 1.1 km away
- Proposed Expansion of Existing Grinding, Screening and Sorting of Manganese… — under environmental review, 1.5 km away
- Proposed Production of Iron Castings and Iron Components at MIDC Butibori,… — withdrawn, 2 km away
- Regularization of Existing Rolling Mill of Capacity 28,000 TPA (25, 000 TPA… — cleared for impact study, 2.1 km away
- Proposed Wainganga Nalganga River Link Project (Link-0 and Link-1) — under environmental review, 2.2 km away
- Manufacturing of 2500 TPM Manganese Oxide Plot No. D-50 MIDC Butibori,… — environmental approval granted, 3.8 km away
- Manufacturing of 2500 TPM Manganese Oxide Plot No. D-50 MIDC Butibori,… — cleared for impact study, 3.8 km away
- M/s. Indo U K Healthcare Private Ltd. Proposed a New Project of Common Bio… — environmental approval granted, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.