Quick answers
What is this project?
1200 MTPD Solar Glass plant by M/s. Avaada Glass Pvt. Ltd., at Plot No. A-67-A, MIDC Road, Additional Butibori Industrial Area, Nagpur, Maharashtra, 441108 is a proposed industrial building project in Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra. The site covers 49.5 acres.
Who is building it?
The applicant is Avaada Glass Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 Jan 2026), as of 27 Nov 2026.
Where is it?
In Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹1,685 crore and a site of 49.5 acres.
When was it filed?
The application was filed on 23 Jan 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 1200 MTPD Solar Glass plant by M/s. Avaada Glass Pvt. Ltd., at Plot No. A-67-A, MIDC…
Project details
| Official title | Proposed installation of 1200 MTPD Solar Glass plant by M/s. Avaada Glass Pvt. Ltd., at Plot No. A-67-A, MIDC Road, Additional Butibori Industrial Area, Nagpur, Maharashtra, 441108 |
|---|---|
| Status | Cleared for impact study |
| Status since | 27 Jan 2026 |
| Application filed | 23 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Avaada Glass Private Limited |
| Use | Industrial |
| Land area | 49.5 acres (20 ha) |
| Project cost | ₹1,685 crore |
| Village / locality | Dhawalpeth |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11205 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 May 2026 | Environmental approval granted | 49.5 acres | ₹1,685 crore |
| Early planning filed 23 Jan 2026 (this page) | Cleared for impact study | 49.5 acres | ₹1,685 crore |
In context
168 applications in Nagpur since January 2022 are in the same category (Buildings & townships): 128 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.5 acres, this one is larger than 77% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 1200 MTPD Solar Glass plant by M/s. Avaada Glass Pvt. Ltd., at Plot No.… — environmental approval granted, 0 m away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — environmental approval granted, 300 m away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — initial checks, 300 m away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — environmental approval granted, 300 m away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — cleared for impact study, 300 m away
- Integrated 6 GW cell and 4GW module line plant by M/s. Avaada Electro Pvt.… — environmental approval granted, 300 m away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — environmental approval granted, 400 m away
- Addl. Butibori I.A. Village Tarsi Survey No 148 — lapsed, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.