What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Nagpur, Maharashtra

Integrated 6 GW cell and 4GW module line plant by M/s. Avaada Electro Pvt. Ltd., at Plot No. A-67, MIDC Road, Additional Butibori Industrial area, Nagpur, Maharashtra, 441108

Integrated 6 GW cell and 4GW module line plant by M/s. Avaada Electro Pvt. Ltd., at Plot No. A-67, MIDC Road, Additional Butibori Industrial area, Nagpur, Maharashtra, 441108 is an approved industrial building project in Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra. The site covers 179.8 acres. Its stated project cost is ₹3,272 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 Apr 2025).

See it on the live map All projects in Nagpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Integrated 6 GW cell and 4GW module line plant by M/s. Avaada Electro Pvt. Ltd., at Plot No. A-67, MIDC Road, Additional Butibori Industrial area, Nagpur, Maharashtra, 441108 is an approved industrial building project in Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra. The site covers 179.8 acres.

Who is building it?

The applicant is Avaada Electro Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 30 Apr 2025), as of 27 Nov 2026.

Where is it?

In Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra.

How big is it?

It has a stated cost of ₹3,272 crore and a site of 179.8 acres.

When was it filed?

The application was filed on 6 Mar 2025.

Project details

Official titleProposed installation of Integrated 6 GW cell and 4GW module line plant by M/s. Avaada Electro Pvt. Ltd., at Plot No. A-67, MIDC Road, Additional Butibori Industrial area, Nagpur, Maharashtra, 441108
StatusEnvironmental approval granted
Status since30 Apr 2025
Application filed6 Mar 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAvaada Electro Private Limited
UseIndustrial
Land area179.8 acres (72.8 ha)
Project cost₹3,272 crore
Village / localityDhawalpeth
Taluk / tehsilNagpur (Rural)
DistrictNagpur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-10096

In context

168 applications in Nagpur since January 2022 are in the same category (Buildings & townships): 128 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 179.8 acres, this one is larger than 93% of them.

30 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Avaada Electro Private Limited in Nagpur

6 Avaada Electro projects in Nagpur
All 9 Avaada Electro projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.