Cleared for impact studyIndustry · Chandrapur, Maharashtra

"Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to 5,28,000 TPA, MS Steel Ingots / Rolled products (finished) & Steel Ingots from 143,200 TPA to 7,50,000 TPA and Captive Power Plant from 20 MW to 80 MW"

"Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to 5,28,000 TPA, MS Steel Ingots / Rolled products (finished) & Steel Ingots from 143,200 TPA to 7,50,000 TPA and Captive Power Plant from 20 MW to 80 MW" is a proposed industrial project in Tadali (Ct), Chandrapur, Maharashtra. The site covers 103.2 acres. Its stated project cost is ₹1,047.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 May 2026).

See it on the live map All projects in Chandrapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to 5,28,000 TPA, MS Steel Ingots / Rolled products (finished) & Steel Ingots from 143,200 TPA to 7,50,000 TPA and Captive Power Plant from 20 MW to 80 MW" is a proposed industrial project in Tadali (Ct), Chandrapur, Maharashtra. The site covers 103.2 acres.

Who is building it?

The applicant is Omat West Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 May 2026), as of 27 Nov 2026.

Where is it?

In Tadali (Ct), Chandrapur, Maharashtra.

How big is it?

It has a stated cost of ₹1,047.7 crore and a site of 103.2 acres.

When was it filed?

The application was filed on 4 Jun 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to 5,28,000…

Project details

StatusCleared for impact study
Status since4 May 2026
Application filed4 Jun 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantOmat West Limited
Land area103.2 acres (41.8 ha)
Project cost₹1,047.7 crore
Village / localityTadali (Ct)
Taluk / tehsilChandrapur
DistrictChandrapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-07952

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 25 Jun 2026Cleared for impact study103.2 acres₹1,047.7 crore
Early planning filed 4 Jun 2025 (this page)Cleared for impact study103.2 acres₹1,047.7 crore

In context

55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 103.2 acres, this one is smaller than 65% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tadali (Ct), Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Omat West Limited in Chandrapur

All 5 Omat West projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.