Amendment in Environmental Clearance for seeking review of applicability of Sulphur dioxide standards and Exemption from Installation of FGD as per MoEF&CC Notification dated 11.07.2025 for 2×300 MW DIL Thermal Power Plant at Plot No-C6,C7,C8 Tadali Growth Centre, MIDC Tadali, Tal & Dist.-Chandrapur, Maharashtra is an approved power project in Morwa, Chandrapur, Maharashtra. The site covers 480 acres.
Who is building it?
The applicant is Dhariwal Infrastructure Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Jun 2026), as of 27 Nov 2026.
Where is it?
In Morwa, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹3,964.3 crore and a site of 480 acres.
When was it filed?
The application was filed on 5 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jun 2026 |
| Application filed | 5 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Dhariwal Infrastructure Limited |
| Land area | 480 acres (194.3 ha) |
| Project cost | ₹3,964.3 crore |
| Village / locality | Morwa |
| Taluk / tehsil | Chandrapur |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12283 |
In context
10 applications in Chandrapur since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. At 480 acres, this one is larger than 60% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Morwa, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to… — cleared for impact study, 800 m away
- Expansion of Steel Melting Shop & Setting up of 1 x 20 MW Captive Power Plant… — environmental approval granted, 800 m away
- "Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to… — withdrawn, 800 m away
- "Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to… — cleared for impact study, 800 m away
- Transfer of Environment Clearance letter issued by SEIAA Maharashtra, Mumbai… — environmental approval granted, 800 m away
- "Proposed Expansion of manufacturing plant with Sponge Iron from 90,000 TPA to… — cleared for impact study, 850 m away
- Grain Base fuel ethanol unit of 200 KLD, 5.5 MW Co- generation power plant By… — environmental approval granted, 2.4 km away
- Grain Base fuel ethanol unit of 200 KLD, 5.5 MW Co- generation power plant By… — lapsed, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.