Ideal Energy Projects Limited (Expansion of Existing Thermal Power Plant)

Ideal Energy Projects Limited (Expansion of Existing Thermal Power Plant) is a lapsed power project in Khursapar, Umred, Nagpur, Maharashtra. The site covers 249.6 acres. Its stated project cost is ₹4,200 crore. As of 27 Nov 2026, its status is “Lapsed” (since 19 Dec 2025).

See it on the live map All projects in Nagpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Ideal Energy Projects Limited (Expansion of Existing Thermal Power Plant) is a lapsed power project in Khursapar, Umred, Nagpur, Maharashtra. The site covers 249.6 acres.

Who is building it?

The applicant is Ideal Energy Projects Limited.

Has it been approved?

No. The application was lapsed on 19 Dec 2025, so it is no longer under consideration.

Where is it?

In Khursapar, Umred, Nagpur, Maharashtra.

How big is it?

It has a stated cost of ₹4,200 crore and a site of 249.6 acres.

When was it filed?

The application was filed on 4 Jun 2025.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Ideal Energy Projects Limited (Expansion of Existing Thermal Power Plant)

Project details

StatusLapsed
Status since19 Dec 2025
Application filed4 Jun 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantIdeal Energy Projects Limited
Land area249.6 acres (101 ha)
Project cost₹4,200 crore
Village / localityKhursapar
Taluk / tehsilUmred
DistrictNagpur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-10641

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 18 Aug 2026Environmental approval granted249.3 acres₹4,200 crore
Amendment filed 23 Sept 2025Lapsed249.6 acres₹4,200 crore
Early planning filed 26 Aug 2025Cleared for impact study249.3 acres₹4,200 crore
Early planning filed 4 Jun 2025 (this page)Lapsed249.6 acres₹4,200 crore

In context

10 applications in Nagpur since January 2022 are in the same category (Power): 3 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 249.6 acres, this one is larger than 80% of them.

Where it is

Khursapar, Umred, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Ideal Energy Projects projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.