What is this project?
Proposed Synthetic Organic Chemical Manufacturing Unit at Kh No. 13/3, PH No. 52A, Mouza Amgaon, Taluka Nagpur, Dist.- Nagpur by M/s. Rudraksha Allied Chemical Pvt. Ltd is a proposed industrial project in Amgaon, Nagpur (Rural), Nagpur, Maharashtra. The site covers 8.9 acres.
Who is building it?
The applicant is Rudraksha Allied Chemical P LTD.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 May 2026), as of 27 Nov 2026.
Where is it?
In Amgaon, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹49.6 crore and a site of 8.9 acres.
When was it filed?
The application was filed on 22 Apr 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 May 2026 |
| Application filed | 22 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rudraksha Allied Chemical P LTD |
| Land area | 8.9 acres (3.6 ha) |
| Project cost | ₹49.6 crore |
| Village / locality | Amgaon |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12610 |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 8.9 acres, this one is smaller than 65% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amgaon, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Coal to Chemicals & Petrochemical based Products project… — returned to applicant, 2.2 km away
- Coal to chemical (Petrochemical based products) project by Nagpur Syn-Gas &… — lapsed, 3.3 km away
- Diversion of Landlocked & Isolated Piece of Forest Land (Zudpi Jungle) for… — initial checks, 3.5 km away
- Regularization of Manufacturing of Steel Casting Products through Continuous… — cleared for impact study, 3.9 km away
- Diversion of 0.68 Ha. of Forest Land For Approach Road & Developing Public… — initial checks, 4.1 km away
- Diversion of 0.038 Forest Land — lapsed, 4.7 km away
- Diversion of forest land for the Proposed Integrated Coal to Chemicals Project… — more information requested, 4.8 km away
- Diversion of forest land for the Proposed Integrated Coal to Chemicals Project… — under forest review, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.