What is Diversion of 0.038 Forest Land?
Diversion of 0.038 Forest Land is a lapsed road project in Dhankundav, Katol, Nagpur, Maharashtra. The site covers 0.1 acres.
Who is building it?
The applicant is Hemraj Bharbat.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Dhankundav, Katol, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹2.5 crore; a site of 0.1 acres and 380 m² of forest land.
When was it filed?
The application was filed on 9 Dec 2022.
Project details
| Official title | Diversion of 0.038 Forest Land in Village Dhankund, Taluka Katol, District Nagpur Maharashtra for Widening of Approach Road for Establishing Agribusiness Center. |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2023 |
| Application filed | 9 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Hemraj Bharbat |
| Land area | 400 m² |
| Forest land | 380 m² |
| Project cost | ₹2.5 crore |
| Village / locality | Dhankundav |
| Taluk / tehsil | Katol |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15981 |
In context
31 applications in Nagpur since January 2022 are in the same category (Roads & highways): 1 approved, 23 filed or under review, and 7 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 96% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhankundav, Katol, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Solar Industries India Limited — forest land use approved, 1.6 km away
- Industrial project by Solar Industries India Ltd. — lapsed, 1.6 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — environmental approval granted, 1.7 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — cleared for impact study, 1.7 km away
- Expansion of existing project for the manufacturing of Explosives and Defense… — returned to applicant, 2.1 km away
- Regularization of Manufacturing of Steel Casting Products through Continuous… — cleared for impact study, 3.3 km away
- Diversion of Landlocked & Isolated Piece of Forest Land (Zudpi Jungle) for… — initial checks, 3.3 km away
- Proposed Synthetic Organic Chemical Manufacturing Unit at Kh No. 13/3, PH No.… — cleared for impact study, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.