Quick answers
What is this project?
Diversion of Landlocked & Isolated Piece of Forest Land (Zudpi Jungle) for Establishment of Vriksha Vatika is a proposed project in Bajargaon, Nagpur (Rural), Nagpur, Maharashtra. The site covers 0.7 acres.
Who is building it?
The applicant is Taori Associates.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bajargaon, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹7 lakh; a site of 0.7 acres and 2,800 m² of forest land.
When was it filed?
The application was filed on 12 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 13 Oct 2026 |
| Application filed | 12 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Taori Associates |
| Land area | 2,800 m² |
| Forest land | 2,800 m² |
| Project cost | ₹7 lakh |
| Village / locality | Bajargaon |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15131 |
In context
17 applications in Nagpur since January 2022 are in the same category (Other): 0 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. At 0.7 acres, this one is smaller than 100% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bajargaon, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of Manufacturing of Steel Casting Products through Continuous… — cleared for impact study, 450 m away
- Industrial project by Solar Industries India Limited — forest land use approved, 3.1 km away
- Industrial project by Solar Industries India Ltd. — lapsed, 3.1 km away
- Diversion of 0.038 Forest Land — lapsed, 3.3 km away
- Expansion of existing project for the manufacturing of Explosives and Defense… — returned to applicant, 3.3 km away
- Proposed Synthetic Organic Chemical Manufacturing Unit at Kh No. 13/3, PH No.… — cleared for impact study, 3.5 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — environmental approval granted, 4.4 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — cleared for impact study, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.