Forest Diversion Proposal Over 39.864 Ha of Forest Land for Optimum and Systematic Development of the Proposed Integrated Steel Plant (Isp), Cpp & Allied Projects Adjoining & Within the Acquired Additional Land Over 477.662 Ha Adjoining to the Existing Industrial Land in Plot A1, Chamorshi Industrial Area is a proposed industrial project in Konsari, Chamorshi, Gadchiroli, Maharashtra. The site covers 98.8 acres.
Who is building it?
The applicant is Maharashtra Industrial Development Corporation.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Konsari, Chamorshi, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹25,000 crore; a site of 98.8 acres and 98.5 acres (39.9 ha) of forest land.
When was it filed?
The application was filed on 16 Oct 2026.
Project details
| Official title | Forest Diversion Proposal Over 39.864 Ha of Forest Land for Optimum and Systematic Development of the Proposed Integrated Steel Plant (Isp), Cpp & Allied Projects Adjoining & Within the Acquired Additional Land Over 477.662 Ha Adjoining to the Existing Industrial Land in Plot A1, Chamorshi Industrial Area in Village Konsari Under Chamorshi Tahsil and Markanda Reserved Forest of Gadchiroli District in Favour of Maharashtra Industrial Development Corporation (Midc), Maharashtra. |
|---|---|
| Status | More information requested |
| Status since | 30 Oct 2026 |
| Application filed | 16 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Maharashtra Industrial Development Corporation |
| Land area | 98.8 acres (40 ha) |
| Forest land | 98.5 acres (39.9 ha) |
| Project cost | ₹25,000 crore |
| Village / locality | Konsari |
| Taluk / tehsil | Chamorshi |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15233 |
In context
30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 98.8 acres, this one is smaller than 90% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Konsari, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion by Thickening & Filtration Unit from 10 to 10.6 MTPA &… — under environmental review, 750 m away
- Expansion and Modification of an existing plant facilities (62,700 TPA DRI to… — initial checks, 750 m away
- Expansion and Modification of an existing plant facilities (62,700 TPA DRI to… — environmental approval granted, 750 m away
- Expansion and Modification of an existing plant facilities (62,700 TPA DRI to… — cleared for impact study, 750 m away
- Expansion of Project by Installation of 2 x 4.5 MTPA Iron Ore Grinding Unit,… — environmental approval granted, 1.2 km away
- Expansion of Project by Installation of 2 x 4.5 MTPA Iron Ore Grinding Unit,… — environmental approval granted, 1.2 km away
- Expansion of Project by Installation of 2 x 4.5 MTPA Iron Ore Grinding Unit,… — cleared for impact study, 1.2 km away
- Proposed Diversion of Forest Land Over 13.726 Ha for Proposed Railway Line and… — not approved, 1.7 km away
More from Maharashtra Industrial Development Corporation in Gadchiroli
- Diversion of 36.25 Ha. Forest Land for Integrated Steel Plant of 25.0 Mtpa… — under forest review
All 33 Maharashtra Industrial Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.