Not approvedBuildings & townships · Gadchiroli, Maharashtra

Proposed Diversion of Forest Land Over 13.726 Ha for Proposed Railway Line and Conveyor Route to Interlink Between Two Plant

Proposed Diversion of Forest Land Over 13.726 Ha for Proposed Railway Line and Conveyor Route to Interlink Between Two Plant is a rejected building project in Reserved Forest, Chamorshi, Gadchiroli, Maharashtra. The site covers 33.9 acres. Its stated project cost is ₹70 crore. As of 27 Nov 2026, its status is “Not approved” (since 27 Sept 2024).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Diversion of Forest Land Over 13.726 Ha for Proposed Railway Line and Conveyor Route to Interlink Between Two Plant is a rejected building project in Reserved Forest, Chamorshi, Gadchiroli, Maharashtra. The site covers 33.9 acres.

Who is building it?

The applicant is Lloyds Metals and Energy Limited.

Has it been approved?

No. The application was rejected on 27 Sept 2024.

Where is it?

In Reserved Forest, Chamorshi, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹70 crore; a site of 33.9 acres and 33.9 acres (13.7 ha) of forest land.

When was it filed?

The application was filed on 3 Sept 2024.

Project details

Official titleProposed Diversion of Forest Land Over 13.726 Ha for Proposed Railway Line and Conveyor Route to Interlink Between Two Plant at Village Konsari & Jairampur and Onward Transport Through Proposed Rail Network Under South-East-Central Railway, Nagpur Under Jurisdiction of Alapalli Forest Division in Favour of Lloyds Metals and Energy Limited.
StatusNot approved
Status since27 Sept 2024
Application filed3 Sept 2024
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantLloyds Metals and Energy Limited
Land area33.9 acres (13.7 ha)
Forest land33.9 acres (13.7 ha)
Project cost₹70 crore
Village / localityReserved Forest
Taluk / tehsilChamorshi
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15169

In context

31 applications in Gadchiroli since January 2022 are in the same category (Buildings & townships): 4 approved, 15 filed or under review, and 12 withdrawn, lapsed or rejected. At 33.9 acres, this one is smaller than 77% of them.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Reserved Forest, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lloyds Metals and Energy Limited in Gadchiroli

29 Lloyds Metals and Energy projects in Gadchiroli
All 40 Lloyds Metals and Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.