Quick answers
What is this project?
Proposed Works Under the Jal Jeewan Mission Scheme Well, Solar Pump House Under Sub-Section (2) of Section 3 of Fra Act, 2006 and 2008 Mouja Kinkidhoda Under Gram Panchayat Pusagondi Tehsil Katol Dist Nagpur is a proposed power project in Kinki Dhoda, Katol, Nagpur, Maharashtra. The site covers 0.1 acres.
Who is building it?
The applicant is Gat Grampanchayat Pusagondi Kinkidhoda.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kinki Dhoda, Katol, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 0.1 acres.
When was it filed?
The application was filed on 29 Oct 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 29 Oct 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Gat Grampanchayat Pusagondi Kinkidhoda |
| Land area | 300 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Kinki Dhoda |
| Taluk / tehsil | Katol |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16500 |
In context
10 applications in Nagpur since January 2022 are in the same category (Power): 3 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 100% of them.
Where it is
Kinki Dhoda, Katol, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing project for the manufacturing of Explosives and Defence… — environmental approval granted, 8.6 km away
- Expansion of existing project for the manufacturing of Explosives and Defence… — cleared for impact study, 8.6 km away
- Diversion of 0.90 ha. of Forest land for developing public amenities — under forest review, 11.2 km away
- Expansion of existing project for the manufacturing of Explosives and Defense… — returned to applicant, 11.7 km away
- Industrial project by Solar Industries India Limited — forest land use approved, 12.2 km away
- Industrial project by Solar Industries India Ltd. — lapsed, 12.2 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — environmental approval granted, 12.2 km away
- Proposed expansion of existing explosive products by M/s. Keltech Energies Ltd — cleared for impact study, 12.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.