Quick answers
What is this project?
Proposed Cng Fuel Station on Land Bearing Survey No.40/1/1 Village Vadkhal, Raigad, Maharashtra is a proposed building project in Wadkhal, Pen, Raigarh, Maharashtra. The site covers 1.1 acres.
Who is building it?
The applicant is Rohan Jage.
Has it been approved?
Yes. Its status is “Recommended by coastal authority” (since 20 Jun 2024), as of 27 Nov 2026.
Where is it?
In Wadkhal, Pen, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹60 lakh and a site of 1.1 acres.
When was it filed?
The application was filed on 22 Feb 2024.
Project details
| Status | Recommended by coastal authority |
|---|---|
| Status since | 20 Jun 2024 |
| Application filed | 22 Feb 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rohan Jage |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Wadkhal |
| Taluk / tehsil | Pen |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17162 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.1 acres, this one is smaller than 75% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wadkhal, Pen, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shambhala Petroleum — recommended by coastal authority, 150 m away
- Railway Line, Bridges and Water pipeline by JSW Steel Limited — more information requested, 2.5 km away
- Laying of Propane Pipeline from BPCL, Uran to GAIL Petrochemical Complex at… — coastal clearance granted, 3 km away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — environmental approval granted, 3.1 km away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — lapsed, 3.1 km away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — cleared for impact study, 3.1 km away
- Proposed construction of Conveyor Belt by JSW Steel Ltd. — more information requested, 3.1 km away
- Expansion of Integrated Steel plant Capacity from 10.0 MTPA to 15 MTPA at JSW… — environmental approval granted, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.