Quick answers
What is this project?
Proposed Manufacturing of Unsaturated Polyester Resin (USPR) Unit by M/s. ADAC Chemicals Pvt. Ltd. at Plot No. T-6/4, Nardana MIDC Phase II, Tal. - Sindkheda, Dist.- Dhule, Maharashtra is a proposed industrial project in Babhalde, Sindkhede, Dhule, Maharashtra. The site covers 1.6 acres.
Who is building it?
The applicant is Adac Chemicals Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Babhalde, Sindkhede, Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹5.5 crore and a site of 1.6 acres.
When was it filed?
The application was filed on 18 Nov 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Manufacturing of Unsaturated Polyester Resin (USPR) Unit by M/s. ADAC Chemicals…
Project details
| Status | Initial checks |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 18 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Adac Chemicals Private Limited |
| Land area | 1.6 acres (0.7 ha) |
| Project cost | ₹5.5 crore |
| Village / locality | Babhalde |
| Taluk / tehsil | Sindkhede |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-18161 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Nov 2026 (this page) | Initial checks | 1.6 acres | ₹5.5 crore |
| Early planning filed 10 May 2025 | Cleared for impact study | 1.6 acres | ₹5.5 crore |
In context
31 applications in Dhule since January 2022 are in the same category (Industry): 19 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.6 acres, this one is smaller than 94% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Babhalde, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacturing of Unsaturated Polyester Resin (USPR) Unit by M/s. ADAC… — cleared for impact study, 0 m away
- Proposed Chemical Fertilizers Manufacturing Unit with Production Capacity of… — cleared for impact study, 950 m away
- Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. — environmental approval granted, 1 km away
- Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. — returned to applicant, 1 km away
- Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. — cleared for impact study, 1 km away
- Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot… — environmental approval granted, 1.1 km away
- Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot… — cleared for impact study, 1.1 km away
- Proposed Phosphatic Fertilizer and Allied products manufacturing Industry by… — cleared for impact study, 1.4 km away