What is Wah Pynkon-2 Limestone Mine (4.518 ha)?
Wah Pynkon-2 Limestone Mine (4.518 ha) is a proposed mining project in Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The site covers 11.2 acres.
Who is building it?
The applicant is Lamshwa Kyndoh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 11.2 acres.
When was it filed?
The application was filed on 15 Apr 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 8 Oct 2026 |
| Application filed | 15 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Lamshwa Kyndoh |
| Land area | 11.2 acres (4.5 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Lum Shnong |
| Taluk / tehsil | Khliehriat |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00255 |
In context
65 applications in East Jaintia Hills since January 2022 are in the same category (Mining): 49 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.2 acres, this one is smaller than 74% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 22.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 25 mining leases have applied within 5 km.
Where it is
Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wah Pynkon Limestone Mine (4.739 ha) — under environmental review, 200 m away
- Proposed Lum Padiar Shale Mine (Area 21.16 Ha) with Shale Production Capacity:… — cleared for impact study, 900 m away
- Enhancement in Cement Clinker Capacity from 1.75 MTPA to 2.25 MTPA of Clinker… — initial checks, 1.1 km away
- 43 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted, 1.2 km away
- 43 MW imported coal based Thermal Power Plant project at Lumshnong, East… — withdrawn, 1.2 km away
- 8 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted, 1.2 km away
- 100% Coal-based 8 MW Thermal Power Plant project at Lumshnong, East Jaintia… — withdrawn, 1.2 km away
- GVIL Shale Mine — environmental approval granted, 1.2 km away
More from Lamshwa Kyndoh in East Jaintia Hills
- Wah Pynkon Limestone Mine (4.739 ha) — under environmental review
- Shiahtah Limestone Mine — lapsed
- Chetah Lashi Limestone Mine — environmental approval granted