Quick answers
What is this project?
Enhancement in Cement Clinker Capacity from 1.75 MTPA to 2.25 MTPA of Clinker Manufacturing Unit without an increase in pollution load (as per MoEF&CC notification S.O. 980 (E) dated 02.03.2021) is a proposed industrial project in Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The site covers 185.3 acres.
Who is building it?
The applicant is Star Cement Meghalaya Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹700.8 crore and a site of 185.3 acres.
When was it filed?
The application was filed on 15 Sept 2023.
Project details
| Status | Initial checks |
|---|---|
| Status since | 15 Sept 2023 |
| Application filed | 15 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Star Cement Meghalaya Limited |
| Land area | 185.3 acres (75 ha) |
| Project cost | ₹700.8 crore |
| Village / locality | Lum Shnong |
| Taluk / tehsil | Khliehriat |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site area on record |
| Our reference | WID-ML-00026 |
In context
12 applications in East Jaintia Hills since January 2022 are in the same category (Industry): 6 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 185.3 acres, this one is smaller than 58% of them.
51 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 8 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted, 150 m away
- 100% Coal-based 8 MW Thermal Power Plant project at Lumshnong, East Jaintia… — withdrawn, 150 m away
- 43 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted, 250 m away
- 43 MW imported coal based Thermal Power Plant project at Lumshnong, East… — withdrawn, 250 m away
- Amendment in Environmental Clearance for project, "Installation of New Line-… — lapsed, 750 m away
- Wah Pynkon-2 Limestone Mine (4.518 ha) — under environmental review, 1.1 km away
- Larung Limestone Mine — cleared for impact study, 1.2 km away
- "Surve Larung Lumshnong Limestone Deposit (44.58 Ha.)'' with a proposed… — under environmental review, 1.3 km away
More from Star Cement Meghalaya Limited in East Jaintia Hills
- 8 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted
- 43 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted
- 43 MW imported coal based Thermal Power Plant project at Lumshnong, East… — withdrawn
- 100% Coal-based 8 MW Thermal Power Plant project at Lumshnong, East Jaintia… — withdrawn
- "Brishyrnot Limestone Deposit-II'' with proposed maximum production capacity… — environmental approval granted
- "Brishyrnot Limestone Deposit-II'' with proposed maximum production capacity… — cleared for impact study
All 7 Star Cement Meghalaya projects across India
About this information