Quick answers
What is GVIL Shale Mine?
GVIL Shale Mine is an approved mining project in Bri Shyrnot, Khliehriat, East Jaintia Hills, Meghalaya. The site covers 11.8 acres.
Who is building it?
The applicant is Green Valliey Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Jul 2024), as of 27 Nov 2026.
Where is it?
In Bri Shyrnot, Khliehriat, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹22 lakh and a site of 11.8 acres.
When was it filed?
The application was filed on 10 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Jul 2024 |
| Application filed | 10 May 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Green Valliey Industries Limited |
| Land area | 11.8 acres (4.8 ha) |
| Project cost | ₹22 lakh |
| Village / locality | Bri Shyrnot |
| Taluk / tehsil | Khliehriat |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00117 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 10 May 2024 (this page) | Environmental approval granted | 11.8 acres | ₹22 lakh |
| New project filed 28 Dec 2023 | Environmental approval granted | 11.8 acres | ₹22 lakh |
In context
65 applications in East Jaintia Hills since January 2022 are in the same category (Mining): 49 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.8 acres, this one is smaller than 65% of them.
No other mining lease on record is within 500 m of this site; 23 have applied within 5 km.
Where it is
Bri Shyrnot, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GVIL Shale Mine — environmental approval granted, 0 m away
- Proposed Lum Padiar Shale Mine (Area 21.16 Ha) with Shale Production Capacity:… — cleared for impact study, 700 m away
- Wah Pynkon Limestone Mine (4.739 ha) — under environmental review, 1.1 km away
- Wah Pynkon-2 Limestone Mine (4.518 ha) — under environmental review, 1.2 km away
- "Brishyrnot Limestone Deposit-II'' with proposed maximum production capacity… — cleared for impact study, 1.9 km away
- "Brishyrnot Limestone Deposit-II'' with proposed maximum production capacity… — environmental approval granted, 1.9 km away
- 43 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted, 2.2 km away
- 43 MW imported coal based Thermal Power Plant project at Lumshnong, East… — withdrawn, 2.2 km away
More from Green Valliey Industries Limited in East Jaintia Hills
- "Surve Larung Lumshnong Limestone Deposit (44.58 Ha.)'' with a proposed… — under environmental review
- Madan Pyrda (Block-1) by M/s. Green Valliey Industries Limited — environmental approval granted
- Madan Pyrda (Block-1) by M/s. Green Valliey Industries Limited — environmental approval granted
- Madan Pyrda (Block- 2) Limestone Deposit — environmental approval granted
- Forest Diversion Proposal of Surve Larung Lumshnong Limestone Deposit over an… — under forest review
- "Surve Larung Lumshnong Limestone Deposit (44.58 Ha.)'' with a proposed… — cleared for impact study
All 9 Green Valliey Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.