What is this project?
43 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya is an approved power project in Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The site covers 45 acres.
Who is building it?
The applicant is Star Cement Meghalaya Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Jan 2026), as of 27 Nov 2026.
Where is it?
In Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹183.7 crore and a site of 45 acres.
When was it filed?
The application was filed on 26 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Jan 2026 |
| Application filed | 26 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Star Cement Meghalaya Limited |
| Land area | 45 acres (18.2 ha) |
| Project cost | ₹183.7 crore |
| Village / locality | Lum Shnong |
| Taluk / tehsil | Khliehriat |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00216 |
In context
51 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 43 MW imported coal based Thermal Power Plant project at Lumshnong, East… — withdrawn, 0 m away
- 8 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted, 150 m away
- 100% Coal-based 8 MW Thermal Power Plant project at Lumshnong, East Jaintia… — withdrawn, 150 m away
- Enhancement in Cement Clinker Capacity from 1.75 MTPA to 2.25 MTPA of Clinker… — initial checks, 250 m away
- Larung Limestone Mine — cleared for impact study, 950 m away
- Amendment in Environmental Clearance for project, "Installation of New Line-… — lapsed, 1 km away
- "Surve Larung Lumshnong Limestone Deposit (44.58 Ha.)'' with a proposed… — under environmental review, 1.1 km away
- "Surve Larung Lumshnong Limestone Deposit (44.58 Ha.)'' with a proposed… — cleared for impact study, 1.1 km away
More from Star Cement Meghalaya Limited in East Jaintia Hills
- 8 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted
- 43 MW imported coal based Thermal Power Plant project at Lumshnong, East… — withdrawn
- 100% Coal-based 8 MW Thermal Power Plant project at Lumshnong, East Jaintia… — withdrawn
- "Brishyrnot Limestone Deposit-II'' with proposed maximum production capacity… — environmental approval granted
- "Brishyrnot Limestone Deposit-II'' with proposed maximum production capacity… — cleared for impact study
- Enhancement in Cement Clinker Capacity from 1.75 MTPA to 2.25 MTPA of Clinker… — initial checks
All 7 Star Cement Meghalaya projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.