Quick answers
What is this project?
Expansion of existing Wet Type Coal Washery Project based on Heavy Media Cyclone from 2.5 MTPA to 3 MTPA is an approved mining project in Chmmarkhoh, Chitrangi, Singrauli, Madhya Pradesh. The site covers 15 acres.
Who is building it?
The applicant is M/S R.K Transport & Constructions Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Sept 2023), as of 27 Nov 2026.
Where is it?
In Chmmarkhoh, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹25.5 crore and a site of 15 acres.
When was it filed?
The application was filed on 6 Jul 2023.
Project details
| Official title | Expansion of existing Wet Type Coal Washery Project based on Heavy Media Cyclone from 2.5 MTPA to 3 MTPA at Village-Gorbi, Tehsil-Chitrangi, District-Singrauli, Madhya Pradesh by M/s R.K. Transport & Constructions Ltd.- under para 7 (ii)(a) as per O.M. dated 11.04.2022 |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Sept 2023 |
| Application filed | 6 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | M/S R.K Transport & Constructions Limited |
| Land area | 15 acres (6.1 ha) |
| Project cost | ₹25.5 crore |
| Village / locality | Chmmarkhoh |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02650 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15 acres, this one is larger than 71% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Chmmarkhoh, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environment Clearance (EC), EC amendment and EC for Expansion… — environmental approval granted, 0 m away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 2 km away
- Proposed 2.48 MTPA Coal Washery Project by Mahavir Coal Resources Private… — cleared for impact study, 5 km away
- Block-B Expansion OCP NCL — lapsed, 5.2 km away
- Block-B Expansion OCP NCL — lapsed, 5.3 km away
- Block-B Expansion Project — forest land use approved, 5.3 km away
- Block-B Expansion OCP Project — environmental approval granted, 5.3 km away
- Block-B Expansion OCP Project — environmental approval granted, 5.3 km away
All 3 R K Transport projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.