Quick answers
What is this project?
Bharti Airtel Ltd. 5G OFC Project Bhoura_Sarni_Rampur_Ghodawadi Khurd Route DFO NORTH BETUL is an approved telecom project in Amdhoh, Ghoda Dongri, Betul, Madhya Pradesh. It seeks 3.5 acres of forest land.
Who is building it?
The applicant is Ramayan Bais.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 18 Sept 2024), as of 27 Nov 2026.
Where is it?
In Amdhoh, Ghoda Dongri, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore and 3.5 acres (1.4 ha) of forest land.
When was it filed?
The application was filed on 8 Sept 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 18 Sept 2024 |
| Application filed | 8 Sept 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Ramayan Bais |
| Forest land | 3.5 acres (1.4 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Amdhoh |
| Taluk / tehsil | Ghoda Dongri |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09556 |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
Where it is
Amdhoh, Ghoda Dongri, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 11 KV Jhakas Mix Feeder, FSP Works under RDSS KfW(FSP) package Detail — under forest review, 146.6 km away
- Two laning of Patajan-Basina- Roshni Section of NH-347B (Old SH-26) from Betul… — lapsed, 147.6 km away
- 11 KV Deshli Mix Feeder, FSP Works under RDSS KfW(FSP) package — under forest review, 148 km away
- Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from… — decision issued, 149.9 km away
- 11 KV Jirudhana Mix feeder, FSP works under RDSS KfW (FSP) package under — forest land use approved, 149.9 km away
- 100-Seater Boys' Hostel and a 100-Seater Girls' Hostel — more information requested, 151.6 km away
- New 33/11 KV Gawasen Substation under SSTD scheme — lapsed, 152.2 km away
- BSNL UG OFC Laying under USOF 4G Saturation Project in Range Gawasen Distt-… — lapsed, 152.3 km away
More from Ramayan Bais in Betul
- Bharti Airtel Ltd. 5G OFC Project Bhoura_Choupna ( Van Vikas Nigam) Route DFO… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.