Quick answers
What is Bsnl 4g Saturation Project?
Bsnl 4g Saturation Project is a lapsed telecom project in Sarni, Ghoda Dongri, Betul, Madhya Pradesh. It seeks 0.2 acres of forest land.
Who is building it?
The applicant is Bsnl Betul Mp.
Has it been approved?
No. The application was lapsed on 11 Mar 2024, so it is no longer under consideration.
Where is it?
In Sarni, Ghoda Dongri, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹10 lakh and 900 m² of forest land.
When was it filed?
The application was filed on 9 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Mar 2024 |
| Application filed | 9 Sept 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bsnl Betul Mp |
| Forest land | 900 m² |
| Project cost | ₹10 lakh |
| Village / locality | Sarni |
| Taluk / tehsil | Ghoda Dongri |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10529 |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarni, Ghoda Dongri, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of 2x250 MW (Phase IV) & 1x660 MW (Phase V) -Proposed 2nd unit of… — returned to applicant, 1.3 km away
- 11 KV Satpuda-1 No. Interconnection Work under RDSS Scheme — more information requested, 1.5 km away
- Amendment of lx660 MW Satpura Ultra Super-critical Thermal Power Project -… — under environmental review, 1.8 km away
- Amendment of lx660 MW Satpura Ultra Super-critical Thermal Power Project -… — environmental approval granted, 1.8 km away
- 2x250 MW Thermal Power Plant at Satpura Thermal Power Station (STPS), Sarni –… — environmental approval granted, 2 km away
- 1x660 MW Satpura Super-critical Thermal Power Project (Expansion, Phase-V,… — environmental approval granted, 2 km away
- Development of Samudayik Kendra at Mokshdham — lapsed, 2.4 km away
- P2P Networks Private Limited - Laying of OFC cable between Sarni 220 KV Sub… — forest land use approved, 2.4 km away
More from Bsnl Betul Mp in Betul
- 4g Saturation Project 500 Days — initial checks
- 4G Saturation 500 days — more information requested
- 4G Saturation 500 days — more information requested
- Bsnl 4g Saturation Project — lapsed
- 4g Saturation Project Under Usof Fund at Villages- Laldhana, Adoumor,… — forest land use approved
- 4g Saturation Project at Villages- Arjungondi, Tokara, Kanari, Rampur, Mudha — forest land use approved
88 Bharat Sanchar Nigam (BSNL) projects in Betul
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.