Quick answers
What is Bsnl 4g Saturation Project?
Bsnl 4g Saturation Project is a lapsed telecom project in Dhodra, Bhainsdehi, Betul, Madhya Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Bsnl Betul Mp.
Has it been approved?
No. The application was lapsed on 25 Jan 2024, so it is no longer under consideration.
Where is it?
In Dhodra, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹12 lakh; a site of 0.7 acres and 2,700 m² of forest land.
When was it filed?
The application was filed on 10 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jan 2024 |
| Application filed | 10 Sept 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bsnl Betul Mp |
| Land area | 2,700 m² |
| Forest land | 2,700 m² |
| Project cost | ₹12 lakh |
| Village / locality | Dhodra |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11066 |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.7 acres, this one is larger than 70% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhodra, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project Under 500 Days — lapsed, 0 m away
- Bsnl 4g Saturation Project — lapsed, 150 m away
- 11 KV Chillor Mix feeder, FSP works under RDSS KfW(FSP) package — more information requested, 3.7 km away
- Bsnl 4g Saturation Project — lapsed, 4.9 km away
- Bsnl 4g Saturation Project — lapsed, 4.9 km away
- Electrification of Un-Electrified Villages Utari & Palanga and its habitations… — more information requested, 6.8 km away
- Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from… — forest land use approved, 8.2 km away
- Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from… — decision issued, 8.4 km away
More from Bsnl Betul Mp in Betul
- 4g Saturation Project 500 Days — initial checks
- 4G Saturation 500 days — more information requested
- 4G Saturation 500 days — more information requested
- Bsnl 4g Saturation Project — lapsed
- 4g Saturation Project Under Usof Fund at Villages- Laldhana, Adoumor,… — forest land use approved
- 4g Saturation Project at Villages- Arjungondi, Tokara, Kanari, Rampur, Mudha — forest land use approved
88 Bharat Sanchar Nigam (BSNL) projects in Betul
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.