Quick answers
What is Mizoram State Super-Specialty Cancer and Research Centre?
Mizoram State Super-Specialty Cancer and Research Centre is a withdrawn building project in Muthi, Tlangnuam, Aizawl, Mizoram. The site covers 9.6 acres.
Who is building it?
The applicant is Mizoram State Super-Specialty Cancer & Research Centre.
Has it been approved?
No. The application was withdrawn on 16 Aug 2026, so it is no longer under consideration.
Where is it?
In Muthi, Tlangnuam, Aizawl, Mizoram.
How big is it?
It has a stated cost of ₹280.9 crore and a site of 9.6 acres.
When was it filed?
The application was filed on 16 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mizoram State Super-Specialty Cancer and Research Centre
Project details
| Official title | Establishment of Mizoram State Super-Specialty Cancer and Research Centre |
|---|---|
| Status | Withdrawn |
| Status since | 16 Aug 2026 |
| Application filed | 16 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mizoram State Super-Specialty Cancer & Research Centre |
| Land area | 9.6 acres (3.9 ha) |
| Project cost | ₹280.9 crore |
| Village / locality | Muthi |
| Taluk / tehsil | Tlangnuam |
| District | Aizawl |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00009 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Sept 2026 | Under environmental review | 9.6 acres | ₹280.9 crore |
| New project filed 16 Aug 2026 (this page) | Withdrawn | 9.6 acres | ₹280.9 crore |
In context
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muthi, Tlangnuam, Aizawl, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mizoram State Super-Specialty Cancer and Research Centre — under environmental review, 0 m away
- Diversion of Around 0.97 Ha of Forest Land for Construction of Approach Road… — more information requested, 3 km away
- Twin Tube Uni-Directional Aizawl Bypass Tunnel of 2.5 Km and Its Approaches of… — lapsed, 3.3 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — forest land use approved, 3.9 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — not approved, 4 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — more information requested, 4.6 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed, 4.6 km away
- 2 Lane Aizawl Bypass NH-6 PKG-3 — lapsed, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.