Quick answers
What is this project?
Twin Tube Uni-Directional Aizawl Bypass Tunnel of 2.5 Km and Its Approaches of 2.1km From Km 10.600 to Km 15.200 (Package 2) on Sairang – Phaibawk Section of NH-6 in the State of Mizoram is a lapsed road project in Bung Ib, Tlangnuam, Aizawl, Mizoram. The site covers 2.9 acres.
Who is building it?
The applicant is Kajal Kanti Ghosh.
Has it been approved?
No. The application was lapsed on 1 Sept 2026, so it is no longer under consideration.
Where is it?
In Bung Ib, Tlangnuam, Aizawl, Mizoram.
How big is it?
It has a stated cost of ₹20 lakh; a site of 2.9 acres and 2.9 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 1 Sept 2026.
Project details
| Official title | Construction of Twin Tube Uni-Directional Aizawl Bypass Tunnel of 2.5 Km and Its Approaches of 2.1km From Km 10.600 to Km 15.200 (Package 2) on Sairang – Phaibawk Section of NH-6 in the State of Mizoram . |
|---|---|
| Status | Lapsed |
| Status since | 1 Sept 2026 |
| Application filed | 1 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Kajal Kanti Ghosh |
| Land area | 2.9 acres (1.2 ha) |
| Forest land | 2.9 acres (1.2 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Bung Ib |
| Taluk / tehsil | Tlangnuam |
| District | Aizawl |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00083 |
In context
14 applications in Aizawl since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 8 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bung Ib, Tlangnuam, Aizawl, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Around 0.97 Ha of Forest Land for Construction of Approach Road… — more information requested, 300 m away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — forest land use approved, 950 m away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — not approved, 1.2 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — more information requested, 2.4 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed, 2.4 km away
- Mizoram State Super-Specialty Cancer and Research Centre — under environmental review, 3.3 km away
- Mizoram State Super-Specialty Cancer and Research Centre — withdrawn, 3.3 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.