Quick answers
What is this project?
2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling) in the State of Mizoram under Bharatmala Pariyojna including Muck Disposal Area is a rejected road project in Muthi, Tlangnuam, Aizawl, Mizoram. The site covers 137.8 acres.
Who is building it?
The applicant is Nhidcl.
Has it been approved?
No. The application was rejected on 21 Nov 2024.
Where is it?
In Muthi, Tlangnuam, Aizawl, Mizoram.
How big is it?
It has a stated cost of ₹2,451.2 crore; a site of 137.8 acres and 137.4 acres (55.6 ha) of forest land.
When was it filed?
The application was filed on 27 Oct 2024.
Project details
| Official title | Construction of 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling) in the State of Mizoram under Bharatmala Pariyojna including Muck Disposal Area |
|---|---|
| Status | Not approved |
| Status since | 21 Nov 2024 |
| Application filed | 27 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Nhidcl |
| Land area | 137.8 acres (55.8 ha) |
| Forest land | 137.4 acres (55.6 ha) |
| Project cost | ₹2,451.2 crore |
| Village / locality | Muthi |
| Taluk / tehsil | Tlangnuam |
| District | Aizawl |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00045 |
In context
14 applications in Aizawl since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 8 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muthi, Tlangnuam, Aizawl, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — forest land use approved, 250 m away
- Twin Tube Uni-Directional Aizawl Bypass Tunnel of 2.5 Km and Its Approaches of… — lapsed, 1.2 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — more information requested, 1.2 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed, 1.2 km away
- Diversion of Around 0.97 Ha of Forest Land for Construction of Approach Road… — more information requested, 1.4 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed, 2.4 km away
- Mizoram State Super-Specialty Cancer and Research Centre — under environmental review, 4 km away
- Mizoram State Super-Specialty Cancer and Research Centre — withdrawn, 4 km away
More from Nhidcl in Aizawl
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — forest land use approved
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — more information requested
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed