Quick answers
What is this project?
2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling) in the State of Mizoram under Bharatmala Pariyojna including Muck Disposal Location is an approved road project in Muthi, Tlangnuam, Aizawl, Mizoram. It seeks 137.5 acres of forest land.
Who is building it?
The applicant is Nhidcl.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Apr 2026), as of 27 Nov 2026.
Where is it?
In Muthi, Tlangnuam, Aizawl, Mizoram.
How big is it?
It has a stated cost of ₹2,451.2 crore and 137.5 acres (55.6 ha) of forest land.
When was it filed?
The application was filed on 6 Jan 2025.
Project details
| Official title | Construction of 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling) in the State of Mizoram under Bharatmala Pariyojna including Muck Disposal Location |
|---|---|
| Status | Forest land use approved |
| Status since | 23 Apr 2026 |
| Application filed | 6 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Nhidcl |
| Forest land | 137.5 acres (55.6 ha) |
| Project cost | ₹2,451.2 crore |
| Village / locality | Muthi |
| Taluk / tehsil | Tlangnuam |
| District | Aizawl |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00065 |
In context
14 applications in Aizawl since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 8 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muthi, Tlangnuam, Aizawl, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — not approved, 250 m away
- Twin Tube Uni-Directional Aizawl Bypass Tunnel of 2.5 Km and Its Approaches of… — lapsed, 950 m away
- Diversion of Around 0.97 Ha of Forest Land for Construction of Approach Road… — more information requested, 1.2 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — more information requested, 1.4 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed, 1.4 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed, 2.6 km away
- Mizoram State Super-Specialty Cancer and Research Centre — under environmental review, 3.9 km away
- Mizoram State Super-Specialty Cancer and Research Centre — withdrawn, 3.9 km away
More from Nhidcl in Aizawl
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — not approved
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — more information requested
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.