One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Sponge Iron Plant from 1,60,000 TPA to 2,60,000 TPA by installation of…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 11 Nov 2023 |
| Application filed | 4 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Aryan Ispat and Power Private Limited |
| Land area | 173.3 acres (70.1 ha) |
| Project cost | ₹6 crore |
| Village / locality | Bamaloi |
| Taluk / tehsil | Thelkoloi |
| District | Sambalpur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00198 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 10 Jan 2024 | Lapsed | 173.3 acres | ₹6 crore |
| Early planning filed 4 Nov 2023 (this page) | Withdrawn | 173.3 acres | ₹6 crore |
In context
38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 173.3 acres, this one is larger than 55% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamaloi, Thelkoloi, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Sponge Iron Plant from 1,60,000 TPA to 2,60,000 TPA by… — lapsed, 0 m away
- Industrial project by Aryan Ispat & Power Private Limited — environmental approval granted, 0 m away
- Enhancement of Aluminium production capacity from 3.99 LTPA to 4.99 LTPA and… — initial checks, 1.9 km away
- Environmental Clearance as per Provision under EIA Notification No. S.O. 3250… — under environmental review, 2.1 km away
- Environmental Clearance as per Provision under EIA Notification No. S.O. 3250… — returned to applicant, 2.1 km away
- Environmental Clearance as per Provision under EIA Notification No. S.O. 3250… — returned to applicant, 2.1 km away
- Expansion of Crude Steel Production of Integrated Steel Plant from 4.50 MTPA… — withdrawn, 2.8 km away
- EC for Aluminium Smelter from 3.8LTPA to 6.8LTPA [by addition of 1LTPA… — environmental approval granted, 3 km away
More from Aryan Ispat and Power Private Limited in Sambalpur
- Industrial project by Aryan Ispat & Power Private Limited — environmental approval granted
- Proposed 5.0 MTPA Coal Washery — environmental approval granted
All 4 Aryan Ispat and Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.