Environmental approval grantedIndustry · Sambalpur, Odisha

EC for Aluminium Smelter from 3.8LTPA to 6.8LTPA [by addition of 1LTPA (Recycled metal) & installation of 2LTPA (Renewable Energy Based 180Pots)] and CPP from 900MW to 1230MW [by addition of 180MW Combine Cycle Power Plant (Gas/Oil fired) & 150MW CPP (Coal fired) for Emergency Backup] within the existing plant premises at Villages: Lapanga, Bomaloi, Derba, Khadiapali, Tileimal and Dharopani Tehsil: Rengali District: Sambalpur (Odisha) by Aditya Aluminium (A Unit of M/s. Hindalco Industries Ltd.)

EC for Aluminium Smelter from 3.8LTPA to 6.8LTPA [by addition of 1LTPA (Recycled metal) & installation of 2LTPA (Renewable Energy Based 180Pots)] and CPP from 900MW to 1230MW [by addition of 180MW Combine Cycle Power Plant (Gas/Oil fired) & 150MW CPP (Coal fired) for Emergency Backup] within the existing plant premises at Villages: Lapanga, Bomaloi, Derba, Khadiapali, Tileimal and Dharopani Tehsil: Rengali District: Sambalpur (Odisha) by Aditya Aluminium (A Unit of M/s. Hindalco Industries Ltd.) is an approved industrial project in Tileimal, Thelkoloi, Sambalpur, Odisha. The site covers 3,329.4 acres. Its stated project cost is ₹30,234.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 14 Aug 2025).

See it on the live map All projects in Sambalpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since14 Aug 2025
Application filed10 Jul 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantJagannath Prasad Nayak
Land area3,329.4 acres (1,347.4 ha)
Project cost₹30,234.8 crore
Village / localityTileimal
Taluk / tehsilThelkoloi
DistrictSambalpur
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-01913

In context

38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3,329.4 acres, this one is larger than 84% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tileimal, Thelkoloi, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jagannath Prasad Nayak in Sambalpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.