Setting of Integrated Steel Plant for production of 7.0 MTPA Liquid Steel by ArcelorMittal Nippon Steel India – Paradeep Facility at, Jagatsinghpur District, Odisha is a proposed industrial project in Nuagarh, Paradeep Lock, Jagatsinghapur, Odisha. The site covers 1,609.3 acres.
Who is building it?
The applicant is Arcelormittal Nippon Steel India Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Feb 2023), as of 27 Nov 2026.
Where is it?
In Nuagarh, Paradeep Lock, Jagatsinghapur, Odisha.
How big is it?
It has a stated cost of ₹38,000 crore and a site of 1,609.3 acres.
When was it filed?
The application was filed on 24 Feb 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Feb 2023 |
| Application filed | 24 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Arcelormittal Nippon Steel India Limited |
| Land area | 1,609.3 acres (651.3 ha) |
| Project cost | ₹38,000 crore |
| Village / locality | Nuagarh |
| Taluk / tehsil | Paradeep Lock |
| District | Jagatsinghapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00286 |
In context
6 applications in Jagatsinghapur since January 2022 are in the same category (Industry): 4 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nuagarh, Paradeep Lock, Jagatsinghapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Setting of Integrated Steel Plant for production of 7.0 MTPA Liquid Steel by… — under environmental review, 0 m away
- Integrated Steel Plant in the villages of Udayabata, Nuagarh, and… — more information requested, 1000 m away
- Residential Building (EB+S+14) & Commercial Complex (B+G+4) Building of M/s… — under environmental review, 1.9 km away
- Amalgamation of EC of Captive Power Plant (2x30 MW) with the EC of Pellet… — returned to applicant, 2.1 km away
- Amalgamation of Environment Clearances (ECs) of Pellet Plant # 1&2 (12 MTPA)… — under environmental review, 2.1 km away
- Application for Amendment of Existing Environmental Clearance for the Proposed… — environmental approval granted, 2.2 km away
- Captive Riverine Jetty of Material Handling Capacity of 4.5 MTPA on River… — environmental approval granted, 2.3 km away
- Captive Riverine Jetty of Material Handling Capacity of 4.5 MTPA on River… — returned to applicant, 2.3 km away
More from Arcelormittal Nippon Steel India Limited in Jagatsinghapur
- Setting of Integrated Steel Plant for production of 7.0 MTPA Liquid Steel by… — under environmental review
- Proposed Rehabilitation & Resettlement (R & R) Colony , At. Village… — environmental approval granted
- Laying of 34 inch Dia underground Slurry pipeline by M/s ArcelorMittal Nippon… — lapsed
- Proposed Rehabilitation & Resettlement (R & R) Colony , At. Village… — environmental approval granted
- Expansion of Captive Riverine Jetty Facility with Material Handling Capacity… — lapsed
- Proposed Rehabilitation & Resettlement (R & R) Colony , At. Village… — cleared for impact study
13 Arcelormittal Nippon Steel projects in Jagatsinghapur
All 65 Arcelormittal Nippon Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.