What is Developing? Open the mapMap

Returned to applicantMining · Jagatsinghapur, Odisha

Amalgamation of EC of Captive Power Plant (2x30 MW) with the EC of Pellet Plant #1&2 (12 MTPA), and Expansion of Pellet Plant from 12 MTPA to 19 MTPA by addition of Pellet Plant # 3 of 7 MTPA and Expansion of CPP from 60 MW to 120 MW capacity by ArcelorMittal Nippon Steel India Private Limited – Paradeep facility

Amalgamation of EC of Captive Power Plant (2x30 MW) with the EC of Pellet Plant #1&2 (12 MTPA), and Expansion of Pellet Plant from 12 MTPA to 19 MTPA by addition of Pellet Plant # 3 of 7 MTPA and Expansion of CPP from 60 MW to 120 MW capacity by ArcelorMittal Nippon Steel India Private Limited – Paradeep facility is a proposed mining project in Aganasi, Paradeep Lock, Jagatsinghapur, Odisha. The site covers 254.1 acres. Its stated project cost is ₹6,937.1 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 14 Aug 2025).

See it on the live map All projects in Jagatsinghapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Amalgamation of EC of Captive Power Plant (2x30 MW) with the EC of Pellet Plant #1&2 (12 MTPA), and Expansion of Pellet Plant from 12 MTPA to 19 MTPA by addition of Pellet Plant # 3 of 7 MTPA and Expansion of CPP from 60 MW to 120 MW capacity by ArcelorMittal Nippon Steel India Private Limited – Paradeep facility is a proposed mining project in Aganasi, Paradeep Lock, Jagatsinghapur, Odisha. The site covers 254.1 acres.

Who is building it?

The applicant is Arcelormittal Nippon Steel India Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Aganasi, Paradeep Lock, Jagatsinghapur, Odisha.

How big is it?

It has a stated cost of ₹6,937.1 crore and a site of 254.1 acres.

When was it filed?

The application was filed on 9 Jun 2025.

Project details

Official titleAmalgamation of EC of Captive Power Plant (2x30 MW) with the EC of Pellet Plant #1&2 (12 MTPA), and Expansion of Pellet Plant from 12 MTPA to 19 MTPA by addition of Pellet Plant # 3 of 7 MTPA and Expansion of CPP from 60 MW to 120 MW capacity by ArcelorMittal Nippon Steel India Private Limited – Paradeep facility at Jagatsinghpur district, Odisha.
StatusReturned to applicant
Status since14 Aug 2025
Application filed9 Jun 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantArcelormittal Nippon Steel India Private Limited
Land area254.1 acres (102.8 ha)
Project cost₹6,937.1 crore
Village / localityAganasi
Taluk / tehsilParadeep Lock
DistrictJagatsinghapur
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-02594

In context

48 applications in Jagatsinghapur since January 2022 are in the same category (Mining): 34 approved, 5 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 254.1 acres, this one is larger than 98% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 489.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.

Where it is

Aganasi, Paradeep Lock, Jagatsinghapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Arcelormittal Nippon Steel India Private Limited in Jagatsinghapur

13 Arcelormittal Nippon Steel projects in Jagatsinghapur
All 65 Arcelormittal Nippon Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.