Quick answers
What is this project?
Laying of 34 inch Dia underground Slurry pipeline by M/s ArcelorMittal Nippon Steel India Limited is a lapsed power project in Udayabata, Paradeep Lock, Jagatsinghapur, Odisha. The site covers 1.7 acres.
Who is building it?
The applicant is ArcelorMittal Nippon Steel India Limited.
Has it been approved?
No. The application was lapsed on 26 Jul 2025, so it is no longer under consideration.
Where is it?
In Udayabata, Paradeep Lock, Jagatsinghapur, Odisha.
How big is it?
It has a stated cost of ₹4 lakh and a site of 1.7 acres.
When was it filed?
The application was filed on 28 Feb 2025.
Project details
| Official title | Laying of 34 inch Dia underground Slurry pipeline along with 40 mm dia Power Cable & OFCC communication cable in Keonjhar, Jajpur, Cuttack, Kendrapara and Jagatsingpur district, Odisha by M/s ArcelorMittal Nippon Steel India Limited |
|---|---|
| Status | Lapsed |
| Status since | 26 Jul 2025 |
| Application filed | 28 Feb 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Power |
| Applicant | ArcelorMittal Nippon Steel India Limited |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Udayabata |
| Taluk / tehsil | Paradeep Lock |
| District | Jagatsinghapur |
| State | Odisha |
| Location from | Site area on record |
| Our reference | WID-OR-04840 |
In context
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Udayabata, Paradeep Lock, Jagatsinghapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ro-Pax Jetty at Musadia — coastal clearance granted, 600 m away
- Expansion of Captive Riverine Jetty Facility with Material Handling Capacity… — lapsed, 850 m away
- Captive Riverine Jetty of Material Handling Capacity of 4.5 MTPA on River… — environmental approval granted, 1.1 km away
- Captive Riverine Jetty of Material Handling Capacity of 4.5 MTPA on River… — returned to applicant, 1.1 km away
- Amalgamation of Environment Clearances (ECs) of Pellet Plant # 1&2 (12 MTPA)… — under environmental review, 2 km away
- Amalgamation of EC of Captive Power Plant (2x30 MW) with the EC of Pellet… — returned to applicant, 2.2 km away
- Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer,… — environmental approval granted, 2.5 km away
- Integrated Steel Plant in the villages of Udayabata, Nuagarh, and… — more information requested, 2.6 km away
More from ArcelorMittal Nippon Steel India Limited in Jagatsinghapur
- Setting of Integrated Steel Plant for production of 7.0 MTPA Liquid Steel by… — under environmental review
- Proposed Rehabilitation & Resettlement (R & R) Colony , At. Village… — environmental approval granted
- Proposed Rehabilitation & Resettlement (R & R) Colony , At. Village… — environmental approval granted
- Expansion of Captive Riverine Jetty Facility with Material Handling Capacity… — lapsed
- Proposed Rehabilitation & Resettlement (R & R) Colony , At. Village… — cleared for impact study
- Integrated Steel Plant in the villages of Udayabata, Nuagarh, and… — more information requested
13 Arcelormittal Nippon Steel projects in Jagatsinghapur
All 65 Arcelormittal Nippon Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.