Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 5 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | NTPC Limited (NTPC) |
| Land area | 1,884 acres (762.4 ha) |
| Project cost | ₹969.4 crore |
| Village / locality | Forest |
| Taluk / tehsil | Hemgir |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00332 |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,884 acres, this one is larger than 88% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 9,567.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Forest, Hemgir, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Hindalco Meenakshi Coal Mine: 12 MMTPA Opencast Mine in Sundargarh, Odisha (7 km away).
Other projects nearby
- Dulanaga Opencast Coal Mining Project — environmental approval granted, 0 m away
- NTPC Dulanga Coal Mining Project — lapsed, 100 m away
- Transfer of Forest Clearance (304.75 Ha) of Dulanga Coal mining Project from… — more information requested, 150 m away
- EXPANSION OF DULANGA COAL MINING PROJECT (7.0 to 8.0 MTPA) — lapsed, 250 m away
- Manoharpur Opencast Coal Mine Project — environmental approval granted, 3.3 km away
- Manoharpur Opencast Coal Mine Project — lapsed, 3.3 km away
- Meenakshi Coal Mine — under environmental review, 7 km away
- Meenakshi Coal Mine — under environmental review, 7 km away
More from NTPC Limited (NTPC) in Sundargarh
- Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal… — environmental approval granted
- Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal… — cleared for impact study
- Darlipali Super Thermal Power Project, Stage-II (1x800 MW) — cleared for impact study
- EXPANSION OF DULANGA COAL MINING PROJECT (7.0 to 8.0 MTPA) — lapsed
- Darlipali Super Thermal Power Project, Stage-II (1x800 MW) — cleared for impact study
11 NTPC projects in Sundargarh
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.