Cleared for impact studyPower · Sundargarh, Odisha

Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal Power Plant by Addition of One Unit of 800 MW [1x800MW(Stage-II) Darlipali Super Thermal Power Project] by NTPC

Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal Power Plant by Addition of One Unit of 800 MW [1x800MW(Stage-II) Darlipali Super Thermal Power Project] by NTPC is a proposed power project in Dulinga, Hemgir, Sundargarh, Odisha. The site covers 2,065 acres. Its stated project cost is ₹25,953.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Sept 2025).

See it on the live map All projects in Sundargarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal Power Plant…

Project details

Official titleExpansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal Power Plant by Addition of One Unit of 800 MW [1x800MW(Stage-II) Darlipali Super Thermal Power Project] at Village Darlipali, Raidihi, in Lephripara Tehsil, Village Chuabahal, Kalamegha, Laikera, Bihajor, Kanaktura in Hemgir Tehsil of Sundergarh District and Village Tileimal, Chichinda, Kechobahal, in Jharsuguda Tehsil and Village Chhadarama in Lakhanpur Tehsil of Jharsuguda District in Odisha
StatusCleared for impact study
Status since9 Sept 2025
Application filed9 Jul 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorPower
ApplicantNTPC Limited (NTPC)
Land area2,065 acres (835.7 ha)
Project cost₹25,953.3 crore
Village / localityDulinga
Taluk / tehsilHemgir
DistrictSundargarh
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-02574

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 11 Sept 2025Environmental approval granted2,065 acres₹25,953.3 crore
Amendment filed 9 Jul 2025 (this page)Cleared for impact study2,065 acres₹25,953.3 crore

In context

13 applications in Sundargarh since January 2022 are in the same category (Power): 6 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2,065 acres, this one is larger than 85% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dulinga, Hemgir, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Hindalco Meenakshi Coal Mine: 12 MMTPA Opencast Mine in Sundargarh, Odisha (13 km away).

Other projects nearby

More from NTPC Limited (NTPC) in Sundargarh

11 NTPC projects in Sundargarh
All 129 NTPC projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.