Project details
| Official title | Proposed for Change in Product Mix From 4.0 Mtpa Pellet to 4.0 Mtpa Pellet Or 4.0 Mtpa Filter Cake Or Combination of Both Filter Cake and Pellet Without Changing Total Production Capacity Granted in Ec at Village Village –khurunti , Tehsil- Kalinga Nagar District –jajpur , Odisha |
|---|---|
| Status | Initial checks |
| Status since | 17 Oct 2024 |
| Application filed | 17 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Brahmani River Pellets Limited |
| Use | Industrial |
| Land area | 88 acres (35.6 ha) |
| Plot area | 3,56,100 m² (38,33,025 sq ft) |
| Project cost | ₹644 crore |
| Village / locality | Khurunti |
| Taluk / tehsil | Kalinganagar |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00976 |
In context
13 applications in Jajapur since January 2022 are in the same category (Buildings & townships): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 88 acres, this one is larger than 62% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khurunti, Kalinganagar, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Tata Steel Plans a 10-Million-Tonne Expansion at Kalinganagar, Odisha (3.2 km away).
Other projects nearby
- Proposed Addition and Alternation of Shed 01 and Proposed Shed 03, Admin Block… — lapsed, 900 m away
- Expansion with Modification of Residential Township Project of M/s Tata Steel… — environmental approval granted, 1.5 km away
- Expansion with Modification of Residential Township Project of M/s Tata Steel… — cleared for impact study, 1.5 km away
- Expansion of Existing Integrated Steel Plant of Ninl From 0.981 Mtpa to 9.5… — environmental approval granted, 2.4 km away
- Expansion of Existing Integrated Steel Plant of Ninl From 0.981 Mtpa to 9.5… — returned to applicant, 2.4 km away
- Transfer of existing Environmental Clearance of Neelachal Ispat Nigam Limited,… — environmental approval granted, 2.4 km away
- Expansion of Existing Integrated Steel Plant of Ninl From 0.981 Mtpa to 9.5… — cleared for impact study, 2.4 km away
- Proposed enhancement in production of Hot Metal in Blast Furnace from 1.004… — initial checks, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.