| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2025 |
| Application filed | 6 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Tata Steel Limited |
| Use | Residential |
| Units | 1,744 |
| Towers | 9 |
| Land area | 58.1 acres (23.5 ha) |
| Built-up area | 1,47,380 m² (15,86,384 sq ft) |
| Plot area | 2,35,306 m² (25,32,810 sq ft) |
| Project cost | ₹964 crore |
| Village / locality | Khurunti |
| Taluk / tehsil | Kalinganagar |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01574 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Nov 2024 (this page) | Environmental approval granted | 58.1 acres | ₹964 crore |
| Early planning filed 27 Aug 2024 | Cleared for impact study | 58.1 acres | ₹964 crore |
What the filings say
What is planned
The applicant, Tata Steel Limited, has received environmental approval for the expansion and modification of its residential township at the Kalinga Nagar Industrial Complex. The project report states that the expansion will increase the total built-up area from 1,47,380 sqm to 2,37,691.70 sqm. The township is being developed in two phases. Phase I, which is largely complete with 84% of the area already receiving occupancy, consists of 1,008 dwelling units. The proposed Phase II expansion will add 736 units, bringing the total to 1,744 dwelling units.
The residential components include a mix of bungalows and multi-storey wings. The expansion specifically introduces nine new towers (M1 to M9) with a maximum height of G+14 floors (43.95 metres). Beyond housing, the township includes 20 commercial shops, a creche, a club, a sports complex, an auditorium, and a health centre. The total population of the township after 100% completion is estimated to be 9,354 persons, including 5,554 from the existing phase and 3,800 added through the expansion.
Layout and design
The project is planned over a total plot area of 23.53 hectares (58.187 acres). The land use is distributed as follows:
- Building Footprints: 53,647.76 sqm (22.8%)
- Roads and Pavements: 58,825 sqm (25%)
- Open Space and Parks: 42,167.99 sqm (17.92%)
- Plantation and Greenbelt: 50,672 sqm (21.53%)
- Parking and Utilities: 32,993.78 sqm
The design incorporates a 300-metre wide service corridor and green buffers ranging from 20 to 75 metres wide along the boundaries. Parking facilities are designed to accommodate 1,512 Equivalent Car Spaces (ECS), utilizing a combination of open parking, stilt parking below towers, and podium-level parking.
Land and surroundings
The township is located across the villages of Khurunti and Gadapur in the Danagadi Tehsil of Jajpur district. The site is situated within the Kalinga Nagar Industrial Complex and is designated for industrial use by the Kalinga Nagar Development Authority (KNDA). The surroundings include several industrial units such as the Mesco Steel Plant and Sagar Cements Limited. The nearest major transport links are the Jakhapura Railway Station, located approximately 6 km away, and the Chandikhol-Duburi road (NH-200) which provides primary access. The area is classified under Seismic Zone III, indicating a moderate risk of earthquakes.
Water, power and access
The total water requirement for the expanded township is estimated at 1,302 kilolitres per day (KLD). This includes 854 KLD of fresh water, to be sourced from the Tata Steel Plant reservoir via the Jaraka Irrigation Department, and 448 KLD of recycled water for flushing. A Sewage Treatment Plant (STP) with a capacity of 1,000 KLD using Moving Bed Biofilm Reactor (MBBR) technology is already in place and is planned to be expandable to 1,500 KLD. Treated water will be recycled for plantation (400 KLD) and road washing (90 KLD).
Total power requirement is assessed at 9,189 KW, supplied by the Tata Steel Power Station and TPCODL at a 6.6 kV voltage level. For emergency backup, the township will utilize multiple Diesel Generator (DG) sets with a combined capacity including 2x500 KVA, 2x600 KVA, and 1x350 KVA units.
Environmental safeguards
The township is expected to generate approximately 4,876 kg of solid waste per day. Of this, 2,916 kg is biodegradable waste, which will be treated on-site using Organic Waste Converters (OWC). One OWC with a 3,000 kg/day capacity is already operational, and an additional 1-ton-per-day unit is proposed. Non-biodegradable and recyclable waste will be managed through authorized agencies.
For storm water management, the applicant has planned 102 recharge pits (82 existing and 20 for the expansion) to harvest rooftop and surface runoff for groundwater recharge. The greenbelt plan requires a total of 2,941 trees; 1,926 have already been planted, and 1,015 additional trees will be planted during Phase II development.
Key Figures
| Item | Detail |
|---|---|
| Total Built-up Area | 2,37,691.70 sqm |
| Total Dwelling Units | 1,744 |
| Total Population | 9,354 persons |
| Fresh Water Requirement | 854 KLD |
| STP Capacity | 1,000 KLD |
| Total Power Requirement | 9,189 KW |
| Total Parking Capacity | 1,512 ECS |
| Rainwater Recharge Pits | 102 nos. |
Expansion with Modification of Residential Township Project of Tata Steel Limited Located at Kalinga Nagar Industrial Complex at Khurunti & Gadapur, Dist-Jajpur, Odisha with Increase in Total Built Up Area from 1,47,380 Sqm to 2,37,691.70 Sqm site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
13 applications in Jajapur since January 2022 are in the same category (Buildings & townships): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 58.1 acres, this one is smaller than 85% of them.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khurunti, Kalinganagar, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Tata Steel Plans a 10-Million-Tonne Expansion at Kalinganagar, Odisha (2.2 km away).
Other projects nearby
- Expansion with Modification of Residential Township Project of M/s Tata Steel… — cleared for impact study, 0 m away
- Proposed Addition and Alternation of Shed 01 and Proposed Shed 03, Admin Block… — lapsed, 1.2 km away
- Proposed for Change in Product Mix From 4.0 Mtpa Pellet to 4.0 Mtpa Pellet Or… — initial checks, 1.5 km away
- New Stamp charge By-product Recovery Coke Oven Battery (COBP#3) and subsequent… — initial checks, 1.7 km away
- Proposed for Capacity Enhancement of Coke Production From 0.78 Mtpa to 0.85… — initial checks, 1.7 km away
- CAPACITY EXPANSION OF COKE PRODUCTION FROM 0.78 MTPA to 0.85 MTPA BY… — returned to applicant, 1.7 km away
- Proposed Change in Product Mix From 1.60 Mtpa Cement /Ggbs to 1.60 Mtpa… — initial checks, 1.9 km away
- Proposed Green Hydrogen plant of 1500 Nm3/Hr capacity without changing other… — initial checks, 2.2 km away
More from Tata Steel Limited in Jajapur
- Expansion of Integrated Steel Plant from 8 MTPA Crude Steel & 9 MTPA Finished… — more information requested
- Amendment in Environment Clearance for Replacement of Long Product Mill by… — environmental approval granted
- Transfer of Stage-II/ Final approval of 224.63 ha of diverted Forest land of… — lapsed
- Diversion of 0.155ha of Revenue Forest land within the RoW of R&B Road for… — lapsed
- Forest Diversion proposal for Saruabil Chromite Mine — more information requested
- Forest Diversion Proposal for Kamarda Chromite mine — under forest review
21 Tata Steel projects in Jajapur
All 104 Tata Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.