Project details
| Status | Under environmental review |
|---|---|
| Status since | 11 Sept 2026 |
| Application filed | 3 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hindalco Industries Limited |
| Land area | 3,329.4 acres (1,347.4 ha) |
| Project cost | ₹41,340.3 crore |
| Village / locality | Bamaloi |
| Taluk / tehsil | Thelkoloi |
| District | Sambalpur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01953 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 2 Nov 2026 | Under environmental review | 3,329.4 acres | ₹41,340.3 crore |
| Expansion filed 25 Jun 2026 | Environmental approval granted | 3,329.4 acres | ₹41,340.3 crore |
| Early planning filed 3 Oct 2025 (this page) | Under environmental review | 3,329.4 acres | ₹41,340.3 crore |
In context
38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3,329.4 acres, this one is larger than 84% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamaloi, Thelkoloi, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Aluminium Smelter from 6.8 LTPA to 9.0 LTPA and Captive Power… — under environmental review, 0 m away
- Expansion of Aluminium Smelter from 6.8 LTPA to 9.0 LTPA and Captive Power… — environmental approval granted, 0 m away
- EC for Aluminium Smelter from 3.8LTPA to 6.8LTPA [by addition of 1LTPA… — environmental approval granted, 0 m away
- EC for Aluminium Smelter from 3.8LTPA to 6.8LTPA [by addition of 1LTPA… — environmental approval granted, 0 m away
- EC for Aluminium Smelter from 3.8LTPA to 6.8LTPA [by addition of 1LTPA… — cleared for impact study, 0 m away
- Expansion of Sponge Iron Plant from 1,60,000 TPA to 2,60,000 TPA by… — lapsed, 3 km away
- Industrial project by Aryan Ispat & Power Private Limited — environmental approval granted, 3 km away
- Expansion of Sponge Iron Plant from 1,60,000 TPA to 2,60,000 TPA by… — withdrawn, 3 km away
3 Hindalco Industries projects in Sambalpur
All 38 Hindalco Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.