Under environmental reviewIndustry · Sambalpur, Odisha

Expansion of Aluminium Smelter from 6.8 LTPA to 9.0 LTPA and Captive Power Plant from 1230 MW to 1530 MW within the existing plant premises at villages: Lapanga, Bomaloi, Derba, Khadiapali, Tileimal and Dharopani Tehsil: Rengali, District: Sambalpur (Odisha) by Aditya Aluminium (A Unit of M/s. Hindalco Industries Limited)

Expansion of Aluminium Smelter from 6.8 LTPA to 9.0 LTPA and Captive Power Plant from 1230 MW to 1530 MW within the existing plant premises at villages: Lapanga, Bomaloi, Derba, Khadiapali, Tileimal and Dharopani Tehsil: Rengali, District: Sambalpur (Odisha) by Aditya Aluminium (A Unit of M/s. Hindalco Industries Limited) is a proposed industrial project in Bamaloi, Thelkoloi, Sambalpur, Odisha. The site covers 3,329.4 acres. Its stated project cost is ₹41,340.3 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 3 Nov 2026).

See it on the live map All projects in Sambalpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of Aluminium Smelter from 6.8 LTPA to 9.0 LTPA and Captive Power Plant from…

Project details

StatusUnder environmental review
Status since3 Nov 2026
Application filed2 Nov 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantHindalco Industries Limited
Land area3,329.4 acres (1,347.4 ha)
Project cost₹41,340.3 crore
Village / localityBamaloi
Taluk / tehsilThelkoloi
DistrictSambalpur
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-04884

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 2 Nov 2026 (this page)Under environmental review3,329.4 acres₹41,340.3 crore
Expansion filed 25 Jun 2026Environmental approval granted3,329.4 acres₹41,340.3 crore
Early planning filed 3 Oct 2025Under environmental review3,329.4 acres₹41,340.3 crore

In context

38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3,329.4 acres, this one is larger than 84% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bamaloi, Thelkoloi, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

3 Hindalco Industries projects in Sambalpur
All 38 Hindalco Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.