Quick answers
What is this project?
Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand Quarry Over an Area of 10.06 Ha. Or 24.86 Acres Over Plot No- 3695, Khata No- 446 in Mauza- Nizagarhzami, Tahasil- Talcher, Dist.- Anugul in Favor of Sri Pitambar Bhutia is an approved mining project in Nijigadjami, Colliery, Anugul, Odisha. The site covers 24.9 acres.
Who is building it?
The applicant is Pitambar Bhutia.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Feb 2025), as of 27 Nov 2026.
Where is it?
In Nijigadjami, Colliery, Anugul, Odisha.
How big is it?
It has a stated cost of ₹60 lakh and a site of 24.9 acres.
When was it filed?
The application was filed on 31 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Feb 2025 |
| Application filed | 31 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Pitambar Bhutia |
| Land area | 24.9 acres (10.1 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Nijigadjami |
| Taluk / tehsil | Colliery |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02195 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 31 Jan 2025 (this page) | Environmental approval granted | 24.9 acres | ₹60 lakh |
| Amendment filed 27 Jan 2024 | Not approved | 24.9 acres | ₹60 lakh |
In context
108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.9 acres, this one is smaller than 67% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 42.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Nijigadjami, Colliery, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — not approved, 0 m away
- Dhobapal Sand Quarry over an area of 18.00 acres or 7.28 Hectares bearing… — not approved, 300 m away
- Gopinathpur Sand Mine (on River- Brahmani) for the production of 19500… — environmental approval granted, 1.3 km away
- Application for Mining of sand from Gopinathpur Sand Mine (on River- Brahmani)… — returned to applicant, 1.3 km away
- Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW)… — forest land use approved, 2.2 km away
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review, 2.2 km away
- 2x660 MW (Stage-III, Expansion) Coal based Ultra Super Critical Talcher… — environmental approval granted, 3.3 km away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — initial checks, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.