What is this project?
2x660 MW (Stage-III, Expansion) Coal based Ultra Super Critical Talcher Thermal Power Project, Near Talcher Town, Tehsil Talcher Sadar, Angul District, Odisha by M/s NTPC Ltd is an approved power project in Arjunanali, Colliery, Anugul, Odisha. The site covers 104 acres.
Who is building it?
The applicant is NTPC Limited (NTPC).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 May 2026), as of 27 Nov 2026.
Where is it?
In Arjunanali, Colliery, Anugul, Odisha.
How big is it?
It has a stated cost of ₹12,543 crore and a site of 104 acres.
When was it filed?
The application was filed on 29 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 May 2026 |
| Application filed | 29 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | NTPC Limited (NTPC) |
| Land area | 104 acres (42.1 ha) |
| Project cost | ₹12,543 crore |
| Village / locality | Arjunanali |
| Taluk / tehsil | Colliery |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02936 |
In context
17 applications in Anugul since January 2022 are in the same category (Power): 7 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 104 acres, this one is smaller than 81% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arjunanali, Colliery, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review, 1.3 km away
- Dhobapal Sand Quarry over an area of 18.00 acres or 7.28 Hectares bearing… — not approved, 3 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — environmental approval granted, 3.3 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — not approved, 3.3 km away
- Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW)… — forest land use approved, 3.8 km away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — initial checks, 3.9 km away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — returned to applicant, 3.9 km away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — environmental approval granted, 3.9 km away
More from NTPC Limited (NTPC) in Anugul
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review
- Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW)… — forest land use approved
3 NTPC projects in Anugul
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.