What is Developing? Open the mapMap

Under environmental reviewPower · Anugul, Odisha

Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III: 2x660 MW) to 2120 MW by addition of Stage-IV (1x800 MW) Ultra Super Critical Technology Coal Based Power Plant at Gram panchayat- Santaparha, Jagannathpur, Bantol, & Gurujanguli at Talcher by NTPC

Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III: 2x660 MW) to 2120 MW by addition of Stage-IV (1x800 MW) Ultra Super Critical Technology Coal Based Power Plant at Gram panchayat- Santaparha, Jagannathpur, Bantol, & Gurujanguli at Talcher by NTPC is a proposed power project in Remua, Colliery, Anugul, Odisha. The site covers 551.5 acres. Its stated project cost is ₹24,221 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 13 Jun 2026).

See it on the live map All projects in Anugul

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III: 2x660 MW) to 2120 MW by addition of Stage-IV (1x800 MW) Ultra Super Critical Technology Coal Based Power Plant at Gram panchayat- Santaparha, Jagannathpur, Bantol, & Gurujanguli at Talcher by NTPC is a proposed power project in Remua, Colliery, Anugul, Odisha. The site covers 551.5 acres.

Who is building it?

The applicant is NTPC Limited (NTPC).

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Remua, Colliery, Anugul, Odisha.

How big is it?

It has a stated cost of ₹24,221 crore and a site of 551.5 acres.

When was it filed?

The application was filed on 5 May 2026.

Project details

Official titleExpansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III: 2x660 MW) to 2120 MW by addition of Stage-IV (1x800 MW) Ultra Super Critical Technology Coal Based Power Plant at Gram panchayat- Santaparha, Jagannathpur, Bantol, & Gurujanguli at Talcher in Tehsil Talcher Sadar, Angul District, Odisha by NTPC Limited
StatusUnder environmental review
Status since13 Jun 2026
Application filed5 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantNTPC Limited (NTPC)
Land area551.5 acres (223.2 ha)
Project cost₹24,221 crore
Village / localityRemua
Taluk / tehsilColliery
DistrictAnugul
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03710

In context

17 applications in Anugul since January 2022 are in the same category (Power): 7 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 551.5 acres, this one is smaller than 75% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Remua, Colliery, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from NTPC Limited (NTPC) in Anugul

3 NTPC projects in Anugul
All 129 NTPC projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.