Quick answers
What is this project?
Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW) by NTPC is an approved pipeline project in Belapada, Talcher Sadar, Anugul, Odisha. The site covers 4,953.3 acres.
Who is building it?
The applicant is NTPC Limited (NTPC).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Jul 2025), as of 27 Nov 2026.
Where is it?
In Belapada, Talcher Sadar, Anugul, Odisha.
How big is it?
It has a stated cost of ₹396.1 crore; a site of 4,953.3 acres and 14.9 acres (6 ha) of forest land.
When was it filed?
The application was filed on 12 Dec 2023.
Project details
| Official title | Construction of the Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW). |
|---|---|
| Status | Forest land use approved |
| Status since | 16 Jul 2025 |
| Application filed | 12 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | NTPC Limited (NTPC) |
| Land area | 4,953.3 acres (2,004.5 ha) |
| Forest land | 14.9 acres (6 ha) |
| Project cost | ₹396.1 crore |
| Village / locality | Belapada |
| Taluk / tehsil | Talcher Sadar |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03995 |
In context
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Belapada, Talcher Sadar, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — initial checks, 1.9 km away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — returned to applicant, 1.9 km away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — environmental approval granted, 1.9 km away
- Dhobapal Sand Quarry over an area of 18.00 acres or 7.28 Hectares bearing… — not approved, 2.1 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — environmental approval granted, 2.2 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — not approved, 2.2 km away
- Haturipal Brahmani Sand Quarry over an area of 11.80 Acre or 4.77 Ha — environmental approval granted, 2.3 km away
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review, 2.6 km away
More from NTPC Limited (NTPC) in Anugul
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review
- 2x660 MW (Stage-III, Expansion) Coal based Ultra Super Critical Talcher… — environmental approval granted
3 NTPC projects in Anugul
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.